Posted
Oct 14, 2026
Nov 17, 2026
Cora Drive Sidewalk Improvements Project RFP
Provide sidewalk improvements project. Work includes portland cement concrete sidewalks, ADA ramps, striping, driveways, storm drainage and related items of work.
Description: Work consist of removal and reconstruction of pcc sidewalks, curbs, gutters, and driveway approaches, removal and construction of ac pavement slot trench, removal and reconstruction of wheel chair ramps, repair outlet basin, installation of wood bridge, regrading parkways, restoring parkway irrigation systems and landscaping, install sod, root pruning, tree removals, tree planting, installation of root barriers, striping.
City · CA, US
These related opportunities are still open for bidding.
Posted
Oct 14, 2026
Nov 17, 2026
Provide sidewalk improvements project. Work includes portland cement concrete sidewalks, ADA ramps, striping, driveways, storm drainage and related items of work.
CityIA
Posted
Oct 14, 2026
Nov 11, 2026
Project consists of proposed renovations to the existing park. Construction of a concrete pedestrian pathway connecting the park to the recreation complex on the south side of town.
Glendale Unified School District
School DistrictCA
Posted
Oct 17, 2026
Nov 18, 2026
Notice is hereby given that the governing board ("Board") of the Glendale Unified School District ("District" or "Owner") will receive sealed bids for Bid No. 009-26/27 - Roofing Improvements Project at Multiple Sites. The Project consists of roofing improvements at six (6) school sites: Balboa Elementary School, La Crescenta Elementary School, John C. Fremont Elementary School, John Marshall Elementary School, Thomas Edison Elementary School, and Woodrow Wilson Middle School, per site map/drawings and specifications provided by the District. Contract documents include, but are not limited to, Instructions to Bidders, Bid Form, Bid Bond, Designated Subcontractors List, Site-Visit Certification, various certifications and compliance forms, Performance Bond, Payment Bond, General Conditions, Special Conditions, Drawings, Specifications, and any issued Addenda. The District reserves the right to reject any and all bids and/or waive any irregularities. The District intends to award the Contract to the lowest responsive responsible bidder based on the bid amount per site, or the total base bid amount, whichever is in the District's best interest. Tentative construction start date is April 1, 2027 with an end date of August 8, 2027. Ad publish dates shown: October 17, 2026 and October 24, 2026.
CityCA
Posted
Oct 29, 2026
Nov 20, 2026
Sidewalk improvement. Scope of work includes - 25,000 SF remove and reconstruct 4" thick PCC sidewalk to match existing per City of Pasadena standard plan no. S-421; 2,000 SF remove and reconstruct high-early strength (4,000 PSI) PCC driveway (including sidewalk) per City of Pasaden standard plan No. S-402 to match existing; see attached file.
Decision makers connected to this RFP from City of La Habra.
From the first pre-RFP signals to the published RFP and its files.
Strategic plan
The 2026-27 Annual Action Plan lists planned Alley Area 10 sidewalk replacement, driveway repairs, ADA ramps, utility relocations, and manhole adjustments with $250,000 in CDBG funding.
4 Project Name Public Works -- Alley Area 10 2026-2027 Annual Action Plan 30 Target Area CDBG Eligible Area Goals Supported Public Facility Improvements Needs Addressed Enhance Public Facilities and Infrastructure Funding CDBG: $250,000 Description Project involves sidewalk replacement, driveway repairs, ADA ramps, utility relocations, and adjustments to…
City Of La Habra Annual Action Plan 2026-2027
Strategic plan · 2026
y Center Expansion. The proposed CDBG funding for this project is $268,504. The funds will help transform the Community Center build- ing's annex into a place for La Habra senior citizens to socialize and engage in activities before and after the Senior Meals Program. The Center will also include a workout room with new exercise equipment funded by a grant…
City Council of the City of La Habra Adjourned Regular and Regular Joint Meeting
Meeting agenda · Apr 20, 2026
Meeting agenda
161 days before RFP
The agenda proposed a $80,000-funded Las Palmas Drive project for repaving, curb and gutter, sidewalk and driveway replacements, with construction anticipated in Summer/Fall 2026.
\|---\| \| \|---\| \| Consent Item No. 10. MEETING DATE: 04/20/2026 TO: HON- ORABLE MAYOR AND COUNCILMEMBERS FROM: JIM SADRO, CITY MANAGER By: Elias Saykali, Public Works Director SUBJECT: APPROVE COOPERATIVE AGREEMENT WITH CITY OF FULLERTON FOR THE LAS PALMAS DRIVE STREET IMPROVEMENTS PROJECT \| \| \| \| \| \| \| \|---\| \| RECOMMENDATION: \| \| That the…
Meeting agenda
105 days before RFP
The agenda proposed a FY 2026-2027 transportation programme covering street rehabilitation, curbs and gutters, sidewalks, curb-access ramps, parkways, intersections, signage and striping, supported by estimated Gas Tax and Measure M2 funding.
\|---\| \| \|---\| \| Consent Item No. 7. MEETING DATE: 06/15/2026 TO: HON- ORABLE MAYOR AND COUNCILMEMBERS FROM: JIM SADRO, CITY MANAGER By: Elias Saykali, Public Works Director SUBJECT: APPROVE AND ADOPT THE MEASURE M2 SEVEN-YEAR CAPITAL IMPROVE- MENT PROGRAM AND LOCAL SIGNAL SYNCHRONIZATION PLAN AS PART OF THE MEASURE M2 ELIGIBILITY SUBMITTAL TO ORANGE…
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (Closed)
City Council of the City of La Habra Adjourned Regular and Regular Joint Meeting
Meeting agenda · Apr 20, 2026
City Council Of The City Of La Habra Regular Meeting And Regular Joint Meeting
Meeting agenda · Jun 15, 2026