Boston Water and Sewer Commission
Special DistrictMA
Aug 12, 2026
Closes
Sep 3, 2026
Replacement and Rehabilitation of Sewer and Drain Pipes and Replacement of Water Mains in Roxbury
Work includes approx 350 CY below grade excavation; 2,650 SY temporary paving; 640 LF of 8" DICL water pipe; 1,850 LF of 12" PVC sewer/drain; 830 LF of 12" str lining sewer/drain via cured in place pipe or fold and form pipe lining.