Railroad Street Improvements from Azusa Avenue to Fullerton Road RFP
Work consists of reconstruction of the existing ac pavement. As part of the project, new pcc sidewalk on the north side will be constructed, including reconstruction of driveways, curb ramps, curb and gutter. Also, installation of new streetlight system including conduits, pull boxes, foundations, poles, wires, service pedestal, luminaries and fuses. In addition, power and communication conduits, vaults, switch pads, transformer and transformer pad, primary pull boxes, power cables, switches, and cable devices will be constructed.