Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace four air handler units (AHU).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
All inclusive air handler replacement service.
Posted Date
Dec 17, 2025
Due Date
Jan 5, 2026
Release: Dec 17, 2025
Close: Jan 5, 2026
All inclusive air handler replacement service.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project includes the replacement of steam and chilled water coils in multiple existing air handler units (AHU) and associated duct revisions on level 9 at George Allen Courthouse. Also, the replacement of one air handler unit (AHU) and combining two existing air handler units into one unit located at basement level B1.
Posted Date
Dec 11, 2025
Due Date
Jan 29, 2026
Release: Dec 11, 2025
Close: Jan 29, 2026
This project includes the replacement of steam and chilled water coils in multiple existing air handler units (AHU) and associated duct revisions on level 9 at George Allen Courthouse. Also, the replacement of one air handler unit (AHU) and combining two existing air handler units into one unit located at basement level B1.
AvailableWork includes remove existing air handler, disconnect water, electrical and controls connections; provide new comparable temtrol air handler with minimum 7 zones; provide new piping and control valves serving new air handler; provide labor and materials to install new equipment, modify and connect supply and return ducts as needed; provide labor and materials to connect existing building loop water connections to new equipment; provide labor and materials to connect existing building controls to new equipment; provide insulation.
Posted Date
Dec 12, 2025
Due Date
Jan 12, 2026
Release: Dec 12, 2025
Close: Jan 12, 2026
Work includes remove existing air handler, disconnect water, electrical and controls connections; provide new comparable temtrol air handler with minimum 7 zones; provide new piping and control valves serving new air handler; provide labor and materials to install new equipment, modify and connect supply and return ducts as needed; provide labor and materials to connect existing building loop water connections to new equipment; provide labor and materials to connect existing building controls to new equipment; provide insulation.
AvailableProcure construction project owner's representative services for the air handler replacement project at multiple correctional facilities.
Posted Date
Dec 16, 2025
Due Date
Jan 6, 2026
Release: Dec 16, 2025
Close: Jan 6, 2026
Procure construction project owner's representative services for the air handler replacement project at multiple correctional facilities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →