Summary
This project shall consist of: site work, street and sidewalk improvements, and construction of multiple buildings for the City's new Poulsbo Events and Recreation Center - Phase 1. The project consists of two synthetic turf fields, field and site lighting, site retaining walls, parking lot with drop areas, EV parking areas and recharging stations, a trash enclosure area, a playground, pickleball and multipurpose courts, a connection to the regional stormwater facility, and a trail and paved connections to adjacent parcels. The project also includes several elements, all designed and supplied under separate contracts and listed as Owner Furnished. These include site buildings, playground equipment, field lights, and synthetic turf. The four site-building elements are: a multipurpose building with restrooms and storage, a storage building, and two pavilions. These pre-engineered buildings are all designed and supplied by separate contracts and listed as Owner Furnished - contractor to install, with building packages provided for erection as part of this contract. Similarly, the playground equipment is listed as Owner Furnished, contractor to install, with equipment provided for erection as part of this contract. The synthetic turf and field lights are listed as Owner Furnished, separate contractor to install, and will require coordination between contractors includes 11,918 CY roadway excavation incl haul, 13,066 LF perforated PVC storm sewer pipe 4" diam., 205 LF solid wall DI CL52 storm sewer pipe 12" diam., 725 LF solid wall HDPE storm sewer pipe 24" diam., 3 EA manhole 48" diam. type 2, 343 LF DI. pipe for water main 8" diam., 146 LF service connection 2" diam. D.I. pipe, 568 LF HDPE sewer pipe 8" diam., 702 LF testing sewer pipe.