Closing soon

Add Shore Power Infrastructure for ALS/MWO at LVRC

Description: Orientation, grounding continuity, breaker operation, and functionality of the shore power connection. Any deficiencies identified during testing shall be corrected prior to final acceptance. The Contractor shall restore all disturbed areas to original condition or better, remove all construction debris, and provide record drawings identifying any field modifications. Closeout documentation shall include equipment manuals, warranties, testing and commissioning reports, and any required as-built drawings prior to project acceptance.

Buyer
Released
Aug 7, 2026
Closes
Sep 4, 2026(1 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts