Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project calls for the Demolition, Site Work Only of a 16,744.00 SF Retail Store.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes demolition of buildings and site clearance; pre-demolition hazardous material abatement, demolition of buildings and building slabs, foundations, removal of vegetation and landscaping, on-site utilities, including underground utilities, backfill and compaction of excavated areas for removal of foundations, backfill, compaction and grading of work site, haul-away and proper disposal of all demolished and removed materials and complete cleanup of the work area.
Posted Date
Dec 2, 2025
Due Date
Jan 12, 2026
Release: Dec 2, 2025
Close: Jan 12, 2026
Work includes demolition of buildings and site clearance; pre-demolition hazardous material abatement, demolition of buildings and building slabs, foundations, removal of vegetation and landscaping, on-site utilities, including underground utilities, backfill and compaction of excavated areas for removal of foundations, backfill, compaction and grading of work site, haul-away and proper disposal of all demolished and removed materials and complete cleanup of the work area.
Premium
Access the largest public sector contact database
demolition and site restoration of four (4) Vestas V80 wind turbines
Posted Date
Nov 5, 2025
Due Date
Jan 30, 2026
Release: Nov 5, 2025
Close: Jan 30, 2026
demolition and site restoration of four (4) Vestas V80 wind turbines
AvailableCity of Hickory solicits bids for site construction work for a splashpad, including selective demolition of concrete/asphalt, site grading and topsoil removal; coordination with the splash pad installer; installation of 3-inch water service and 6-inch sewer service; and construction of seat walls, aluminum fencing, shade sails, and concrete surfaces.
Posted Date
Dec 5, 2025
Due Date
Dec 19, 2025
Release: Dec 5, 2025
Close: Dec 19, 2025
City of Hickory solicits bids for site construction work for a splashpad, including selective demolition of concrete/asphalt, site grading and topsoil removal; coordination with the splash pad installer; installation of 3-inch water service and 6-inch sewer service; and construction of seat walls, aluminum fencing, shade sails, and concrete surfaces.
AvailableDisconnecting and capping of existing utilities, demolition of main building. Removal of all foundations, fill in foundations, removal of drive-through columns, median and other building related equipment, and clearing and grading of site to drain, and restoration of site by seeding will also be included. The building(s) have been found to include asbestos and a copy of the inspection report is included in the contract documents. Contract includes environmental abatement for each property as necessary.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
Disconnecting and capping of existing utilities, demolition of main building. Removal of all foundations, fill in foundations, removal of drive-through columns, median and other building related equipment, and clearing and grading of site to drain, and restoration of site by seeding will also be included. The building(s) have been found to include asbestos and a copy of the inspection report is included in the contract documents. Contract includes environmental abatement for each property as necessary.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis