Jul 15, 2026
Closes
Aug 13, 2026
969-H (G) Stormwater Management Facilities Restoration and Construction
Work includes 2,600 CY of excavation class 2; 10,000 CY of sediment excavation and removal, on-site disposal; 400 LF of reinforced concrete pipe class 4 - 15" dia; 400 LF of high density polyethylene (hdpe) dual wall pipe - 15" dia; 400 LF of corrugated aluminized metal pipe - 16 gauge - 15" dia; 40 EA cleaning of existing storm inlet or manhole any size; 1,000 CY of gabions; 2,600 SF of epoxy protective coating for concrete surfaces; 1,000 SY of milling hot mix asphalt paving 1" to 2" depth. See attached file.