Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Los Angeles Department of Water & Power (LADWP) issued an Invitation for Bid for the ‘8003 North Hollywood Central Remediation Well Collector Line’ to construct/complete the collector line work associated with the North Hollywood Central groundwater remediation/treatment project. Bids must be submitted electronically via LADWP’s eRSP system and the posting includes LADWP contact information for technical questions. The estimated value range shown is approximately $5,000,000–$15,000,000 and the procurement is for construction works (not a grant).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Furnish welded steel pipe and appurtenances; Pipe Jacking Construction, including casing material and launching and receiving pits' 860 CY Excavation and disposal of trench subgrade of material; 490 CY Sawcutting, removing, hauling, disposing AC pavement for additional street restoration in addition.
Posted Date
Jan 15, 2026
Due Date
Feb 24, 2026
Release: Jan 15, 2026
Close: Feb 24, 2026
Furnish welded steel pipe and appurtenances; Pipe Jacking Construction, including casing material and launching and receiving pits' 860 CY Excavation and disposal of trench subgrade of material; 490 CY Sawcutting, removing, hauling, disposing AC pavement for additional street restoration in addition.
AvailableThe Project includes the following Work for the Collector Well No. 1 Structural/Electrical Upgrades: Reconstruction of the concrete roof to accommodate new access hatches; new membrane roof material; removal of existing electrical conduit and devices impacted by roof reconstruction; provide new 480-volt panelboard, and variable frequency drives for new pumps, new conduit, wiring, and lighting along the roof; and work as specified herein and as shown on the Drawings. The Project includes the following Work for the Collector Well No. 1 Well Reconstruction: Abandonment of one lateral; provide two new 12-inch-diameter laterals; rehabilitation of two existing laterals; pumping tests on Collector Well No. 1 to determine capacity; provide two new pumps and motors sized for the new well capacity; cored opening at top of caisson wall for drain line; connection of sludge lagoon effluent line from Manhole 3 to Collector Well No. 1 caisson; provide new vertical drain line and supports inside the caisson; two test wells.
Posted Date
-
Due Date
Feb 10, 2026
Construct the chlorination station replacement; perform bi-weekly landscape maintenance work; 550 CY excavation and disposal of site subgrade; 15 CY additional one-sack portland cement/sand slurry backfill.
Posted Date
Dec 15, 2025
Due Date
Feb 12, 2026
Release: Dec 15, 2025
Close: Feb 12, 2026
Construct the chlorination station replacement; perform bi-weekly landscape maintenance work; 550 CY excavation and disposal of site subgrade; 15 CY additional one-sack portland cement/sand slurry backfill.
AvailableThe City of Lodi is soliciting proposals for soil vapor remediation at the Central Plume site, including removal of concrete slab and contaminated soil, installation of a passive subslab depressurization system, and replacement of the slab and related external remediation work. A mandatory pre-bid meeting is scheduled, and the project includes significant hazardous-material remediation tasks and related improvements. The work is a procurement for remediation/construction services (not a grant) with an AI-estimated budget range of approximately $500,000–$2,000,000.
Posted Date
Jan 30, 2026
Due Date
Feb 25, 2026
Release: Jan 30, 2026
Close: Feb 25, 2026
The City of Lodi is soliciting proposals for soil vapor remediation at the Central Plume site, including removal of concrete slab and contaminated soil, installation of a passive subslab depressurization system, and replacement of the slab and related external remediation work. A mandatory pre-bid meeting is scheduled, and the project includes significant hazardous-material remediation tasks and related improvements. The work is a procurement for remediation/construction services (not a grant) with an AI-estimated budget range of approximately $500,000–$2,000,000.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 10, 2026
The Project includes the following Work for the Collector Well No. 1 Structural/Electrical Upgrades: Reconstruction of the concrete roof to accommodate new access hatches; new membrane roof material; removal of existing electrical conduit and devices impacted by roof reconstruction; provide new 480-volt panelboard, and variable frequency drives for new pumps, new conduit, wiring, and lighting along the roof; and work as specified herein and as shown on the Drawings. The Project includes the following Work for the Collector Well No. 1 Well Reconstruction: Abandonment of one lateral; provide two new 12-inch-diameter laterals; rehabilitation of two existing laterals; pumping tests on Collector Well No. 1 to determine capacity; provide two new pumps and motors sized for the new well capacity; cored opening at top of caisson wall for drain line; connection of sludge lagoon effluent line from Manhole 3 to Collector Well No. 1 caisson; provide new vertical drain line and supports inside the caisson; two test wells.
Available