Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of approx. 13.29 miles of roadways, including paving with superpave asphalt mixtures, stone matrix asphalt mixtures, utra-thin bonded wearing course, geotextile paving fabric, heavy duty membrane, concrete pavement patching, guide rail, seeding, tree removal, delineators, signing, pavement markings, bridge improvements, and its devices. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of Removal and disposal of existing stone box culvert (approx. 36"x36") at MP 63.22; 48" round Class V Reinforced Concrete Pipe (RCP) culvert with precast concrete wingwalls at MP 63.22; Removing, resetting, surfacing and aligning track; All other work associated with the Cape Main Culvert Replacement at MP 63.22. Works include approx. 51 LF of 48" reinforced concrete pipe class V; 2 EA precast concrete wingwalls/headwalls.
Posted Date
Jan 23, 2026
Due Date
Feb 19, 2026
Release: Jan 23, 2026
Close: Feb 19, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of Removal and disposal of existing stone box culvert (approx. 36"x36") at MP 63.22; 48" round Class V Reinforced Concrete Pipe (RCP) culvert with precast concrete wingwalls at MP 63.22; Removing, resetting, surfacing and aligning track; All other work associated with the Cape Main Culvert Replacement at MP 63.22. Works include approx. 51 LF of 48" reinforced concrete pipe class V; 2 EA precast concrete wingwalls/headwalls.
AvailableReconstruct Richardson Highway between MP 167 and 173 including roadside hardware and drainage improvements includes 481,000 CY rock excavation, 426,000 CY unclassified excavation, 82,000 LF controlled blasting, 890 ton aggregate base course grading D-1, rumble strips, 2,960 LF CSP 36", 1,550 LF W-beam guardrail. See outside link.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Reconstruct Richardson Highway between MP 167 and 173 including roadside hardware and drainage improvements includes 481,000 CY rock excavation, 426,000 CY unclassified excavation, 82,000 LF controlled blasting, 890 ton aggregate base course grading D-1, rumble strips, 2,960 LF CSP 36", 1,550 LF W-beam guardrail. See outside link.
AvailableThe Georgia Department of Transportation (GDOT) is soliciting bids from pre-qualified contractors to perform vegetation removal services along I-20 EB between mileposts 26.4 and 34.4 in Douglas County, GA. Work includes removal of woody and invasive vegetation, side trimming, stump herbicide treatment, grass installation in cleared areas, debris removal, and required traffic control; contractors must provide labor, equipment, and an ISA Certified Arborist and hold a Georgia Department of Agriculture pesticide license (Category 27). The contract is issued as an RFQ/ITB under RFQC #48400-140-0000033094 with work to begin within 30 days after the mandatory prework meeting and to be completed within 180 days.
Posted Date
Jan 15, 2026
Due Date
Feb 3, 2026
Release: Jan 15, 2026
Close: Feb 3, 2026
The Georgia Department of Transportation (GDOT) is soliciting bids from pre-qualified contractors to perform vegetation removal services along I-20 EB between mileposts 26.4 and 34.4 in Douglas County, GA. Work includes removal of woody and invasive vegetation, side trimming, stump herbicide treatment, grass installation in cleared areas, debris removal, and required traffic control; contractors must provide labor, equipment, and an ISA Certified Arborist and hold a Georgia Department of Agriculture pesticide license (Category 27). The contract is issued as an RFQ/ITB under RFQC #48400-140-0000033094 with work to begin within 30 days after the mandatory prework meeting and to be completed within 180 days.
AvailableConstruction Management Services for County Extension Improvements Program Project 1 MP N0.0 to N4.1.
Posted Date
Jan 21, 2026
Due Date
Feb 3, 2026
Release: Jan 21, 2026
Close: Feb 3, 2026
Construction Management Services for County Extension Improvements Program Project 1 MP N0.0 to N4.1.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →