CityWA
May 7, 2026
Closes
Nov 27, 2026
Description: Work consists of 1 LS Project Temporary Traffic Control; 589 CY Trench Excavation & Disposal; 1 EA 8" Ductile Iron Tee, 3-B, M.J., installed; 2 EA 8" Ductile Iron Ell, M.J., 11 1/4°, installed; 2 EA 8" Ductile Iron Cap, M.J., tapped 2”, installed and removed; 653 LF 8" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Class Thickness No. 52, to furnish, lay and test; 1 LS Traffic Lane Markings.
City · WA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Tacoma.
Adjacent opportunities open for bidding right now.
CityWA
May 7, 2026
Closes
Nov 27, 2026
The City of University Place is seeking bids for the 67th Avenue Phase 1 Improvements roadway project. The project provides curbs, gutters, landscaped pedestrian buffers, six-foot sidewalks, five-foot bicycle lanes, median islands, street lights, and asphalt paving. The estimated construction start date is July 15, 2026, with estimated completion on November 27, 2026.
CityWA
May 7, 2026
Closes
Nov 27, 2026
The City of University Place is seeking bids for the 67th Avenue Phase 1 Improvements roadway project. The project provides curbs, gutters, landscaped pedestrian buffers, six-foot sidewalks, five-foot bicycle lanes, median islands, street lights, and asphalt paving. The estimated construction start date is July 15, 2026, with estimated completion on November 27, 2026.
CityTX
Aug 17, 2026
Closes
Sep 10, 2026
175 LF of furnish and install 8" pvc c-900, dr-14, awwa class 305 water main (restrained), 2311 LF of furnish and install 12 pvc c-900, dr-14, awwa class 305 water main, 2 EA of install 8" gate valve with box and cover (restrained), 8 EA install fire hydrants, 8 EA install 2" water service lines, connection & boxes, 10 CY concrete encasement, cradles, and saddlesat. See outside link.
CityTX
Aug 17, 2026
Closes
Sep 10, 2026
175 LF of furnish and install 8" pvc c-900, dr-14, awwa class 305 water main (restrained), 2311 LF of furnish and install 12 pvc c-900, dr-14, awwa class 305 water main, 2 EA of install 8" gate valve with box and cover (restrained), 8 EA install fire hydrants, 8 EA install 2" water service lines, connection & boxes, 10 CY concrete encasement, cradles, and saddlesat. See outside link.