Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes the following work: spot surface preparation and associated coatings repairs of the interior wet and sport surface preparation and overcoat of the exterior of a 655,000 gallon standpipe.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Village of Park Forest seeks sealed bids for repainting and maintenance of the 3,000,000‑gallon Tamarack standpipe, including surface preparation, debris collection/disposal, and painting. The work includes installing a mixing system and other miscellaneous items. The project is funded in part by an IEPA loan and is subject to Davis‑Bacon, DBE, and other applicable regulations.
Posted Date
Dec 22, 2025
Due Date
Feb 17, 2026
Release: Dec 22, 2025
Close: Feb 17, 2026
The Village of Park Forest seeks sealed bids for repainting and maintenance of the 3,000,000‑gallon Tamarack standpipe, including surface preparation, debris collection/disposal, and painting. The work includes installing a mixing system and other miscellaneous items. The project is funded in part by an IEPA loan and is subject to Davis‑Bacon, DBE, and other applicable regulations.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Repainting the interior and exterior metal surfaces of a 3,000,000-gallon water storage standpipe including surface preparation, collection and disposal of surface preparation debris, and painting; installation of mixing system and other miscellaneous items of work.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
Repainting the interior and exterior metal surfaces of a 3,000,000-gallon water storage standpipe including surface preparation, collection and disposal of surface preparation debris, and painting; installation of mixing system and other miscellaneous items of work.
AvailableThis project's focused is the rehabilitation the village 150,000 gal elevated water storage tank by way of specified overcoating systems and miscellaneous repairs.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
This project's focused is the rehabilitation the village 150,000 gal elevated water storage tank by way of specified overcoating systems and miscellaneous repairs.
AvailableWork consist of 113 EA of roof member repair, 400 EA of pit repair - welding, 125 SF of pit repair - cover plating, demolition of the existing: 24" water service piping from the tank base to the connection at the fence line and 36" water transmission from the valve vault to the fence line, 18" overflow piping. Elevated tank will be repainted. Also included is site work, grading, access road upgrade, electrical, instrumentation, and maintaining access for communication service providers.
Posted Date
Dec 30, 2025
Due Date
Feb 3, 2026
Release: Dec 30, 2025
Close: Feb 3, 2026
Work consist of 113 EA of roof member repair, 400 EA of pit repair - welding, 125 SF of pit repair - cover plating, demolition of the existing: 24" water service piping from the tank base to the connection at the fence line and 36" water transmission from the valve vault to the fence line, 18" overflow piping. Elevated tank will be repainted. Also included is site work, grading, access road upgrade, electrical, instrumentation, and maintaining access for communication service providers.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →