Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project's focused is the rehabilitation the village 150,000 gal elevated water storage tank by way of specified overcoating systems and miscellaneous repairs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Dec 5, 2025
Close: Jan 15, 2026
Elevated water storage tank.
AvailableConstruction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
Posted Date
Dec 2, 2025
Due Date
Jan 15, 2026
Release: Dec 2, 2025
Close: Jan 15, 2026
Construction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
AvailableThe project includes the surface preparation and painting of a 1.0-million-gallon elevated storage tank’s interior and exterior. The tank to be painted is a toro-spherical steel bowl supported by steel legs. Additionally, the project includes the replacement of the cathodic protection system and other minor electrical work.
Posted Date
Nov 20, 2025
Due Date
Jan 15, 2026
Release: Nov 20, 2025
Close: Jan 15, 2026
The project includes the surface preparation and painting of a 1.0-million-gallon elevated storage tank’s interior and exterior. The tank to be painted is a toro-spherical steel bowl supported by steel legs. Additionally, the project includes the replacement of the cathodic protection system and other minor electrical work.
AvailableConstruction of a new 1.0M elevated composite water tank and associated piping and site improvements.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
Construction of a new 1.0M elevated composite water tank and associated piping and site improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →