Streambank Stabilization RFP
Provide Streambank Stabilization.
Description: Work includes removal of existing structures and debris, installation of approximately 194 LF of boulder toe wall and two in-stream boulder vanes, grading and restoration of the washed-out bank, and implementation of sediment and erosion control measures. Disturbed areas and newly constructed slopes will be revegetated to provide final stabilization and reduce the potential for future erosion.
SpecialDistrict · SC, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Kansas Department of Administration
State AgencyKS
Aug 6, 2026
Closes
Sep 10, 2026
Provide Streambank Stabilization.
Kansas Department of Agriculture
State AgencyKS
Aug 6, 2026
Closes
Sep 10, 2026
The Kansas Department of Agriculture is soliciting bids for streambank stabilization services at five sites. The project involves using rock, logs, and vegetation to stabilize riparian streambanks under a one-year contract running from award through September 30, 2027. A mandatory pre-bid conference is scheduled for August 20, 2026, and bids are due September 10, 2026, at 2:00 PM Central Standard Time.
CityTN
Jul 20, 2026
Closes
Aug 18, 2026
The City of Hendersonville, Tennessee is accepting separate bids for the Drakes Creek Greenway Streambank Stabilization project (Bid No. 27-0002). The scope addresses critical bank erosion to protect public greenway infrastructure by performing targeted in-stream grading and water management followed by installation of heavy stone riprap at the bank toe, with bioengineered native plantings on upper slopes under ARAP permit compliance. Bids must be submitted by August 18, 2026, at 2:00 PM (CST) for opening in Conference Room 1 at Hendersonville City Hall.
CityPA
Aug 6, 2026
Closes
Aug 25, 2026
The project involves the stabilization of approx. 160 LF of streambank using dumped rock protection as well as pavement restoration of approx. 200 LF of road.