Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes bridge cleaning; 10 EA. flaggers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 39,6698 ton hot mix asphalt mixture thin lift surface course, 3/8" Mix; 65,295.5 ton hot mix asphalt very high traffic, intermediate course 1/2" Mix; 3,917.8 ton asphalt binder, PG 58-28V, very high traffic; 1,146.7 SY longitudinal grooving in concrete, bridge deck; 45,595.4 LF subdrain, longitudinal, (shoulder) 4". Dia.; 562.5 LF steel beam guardrail; 1,356.830 STA painted pavement markings, waterborne or solvent-based; 1,534 gal. Asphalt emulsion for fog seal (shoulder rumble strips); 60 SF concrete repair; 80 LF paving notch replacement.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 39,6698 ton hot mix asphalt mixture thin lift surface course, 3/8" Mix; 65,295.5 ton hot mix asphalt very high traffic, intermediate course 1/2" Mix; 3,917.8 ton asphalt binder, PG 58-28V, very high traffic; 1,146.7 SY longitudinal grooving in concrete, bridge deck; 45,595.4 LF subdrain, longitudinal, (shoulder) 4". Dia.; 562.5 LF steel beam guardrail; 1,356.830 STA painted pavement markings, waterborne or solvent-based; 1,534 gal. Asphalt emulsion for fog seal (shoulder rumble strips); 60 SF concrete repair; 80 LF paving notch replacement.
Bridge Drainage Cleaning and Related Work at Various Locations.
Posted Date
Dec 29, 2025
Due Date
Jan 27, 2026
Release: Dec 29, 2025
Close: Jan 27, 2026
Bridge Drainage Cleaning and Related Work at Various Locations.
AvailableApprox. 150 ft modified urethane pavement marking - line 6"; 1 LS containment and disposal of non-lead paint cleaning residues no. 1; 1 LS cleaning and painting steel bridge no. 1. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Approx. 150 ft modified urethane pavement marking - line 6"; 1 LS containment and disposal of non-lead paint cleaning residues no. 1; 1 LS cleaning and painting steel bridge no. 1. See outside link.
AvailableWork includes approx. 115 CY excavation, 275 LF guardrail, 760 LF 10" steel H piling, 347.20 CY structural concrete.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
Work includes approx. 115 CY excavation, 275 LF guardrail, 760 LF 10" steel H piling, 347.20 CY structural concrete.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →