Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 172 CY of unclassified excavation; 262 CY of compacted embankment, select fill; 208 TN of aggregate base course (class 7); 125 TN of achm surface course; 526 SF of concrete driveway (6" thick), standard finish; 710 LF of concrete curb & gutter (class 3); 102 lf of storm drain pipes, 15" side drain; 23 LF of storm drain pipes, 18" cross drain; 823 SY of solid sodding, bermuda; 4 EA of wing 3' extension; 2 EA of wing 3' extension; 2 EA of curb inlet - 4' box; 730 LF of silt fence - type a (sfa); etc, see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Install approx. 1,550 LF of new 10" and 12" diameter storm sewer pipe system. The new storm system includes a water quality filter cartridge vault, eight new manholes, and eleven new catch basins; decommissioning of the existing underground injection control (UIC) system; and connection to the existing downstream storm system. Other major work includes new valley gutters, full-depth road rehabilitation along Redfern Avenue, and an asphalt drainage curb along Haven Street.
Posted Date
Dec 19, 2025
Due Date
Jan 28, 2026
Release: Dec 19, 2025
Close: Jan 28, 2026
Install approx. 1,550 LF of new 10" and 12" diameter storm sewer pipe system. The new storm system includes a water quality filter cartridge vault, eight new manholes, and eleven new catch basins; decommissioning of the existing underground injection control (UIC) system; and connection to the existing downstream storm system. Other major work includes new valley gutters, full-depth road rehabilitation along Redfern Avenue, and an asphalt drainage curb along Haven Street.
AvailableRelease: Dec 25, 2025
Close: Jan 26, 2026
Drainage improvements.
Drainage Improvements Project.
Posted Date
Jan 23, 2026
Due Date
Feb 11, 2026
Release: Jan 23, 2026
Close: Feb 11, 2026
Drainage Improvements Project.
AvailableWork includes replacement of a stormwater box culvert and associated drainage infrastructure, sewer pipe and structure relocation, repaving of a portion of winter street, wall demolition and regrading of stream embankment, and all other associated activities.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
Work includes replacement of a stormwater box culvert and associated drainage infrastructure, sewer pipe and structure relocation, repaving of a portion of winter street, wall demolition and regrading of stream embankment, and all other associated activities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis