Sac And Fox Nation Housing Authority
Special DistrictOK
Posted
Oct 14, 2026
Nov 9, 2026
Okmulgee Water Treatment Plant Control System RFP
The project includes the following work: major update of scada system including instruments.
Description: Harford County's DPW - Water and Sewer is soliciting bids to upgrade the pH control system at the Abingdon Water Treatment Plant. The work includes removal and replacement of existing Soda Ash System processing equipment. The project also includes associated loop piping.
County · MD, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Harford County.
Adjacent opportunities open for bidding right now.
Sac And Fox Nation Housing Authority
Special DistrictOK
Posted
Oct 14, 2026
Nov 9, 2026
The project includes the following work: major update of scada system including instruments.
California Department of Parks and Recreation
State AgencyCA
Posted
Sep 23, 2026
Oct 23, 2026
Procurement and installation of six (6) Wall Spring membrane filtration system units, backboard support, booster pump, variable frequency drive (VFD), water quality analyzers, air compressors, control panels, conduit & wiring, instrumentation, tubing, piping, appurtenances and supports. Demolition of existing booster pump and additional piping as noted on plans and as required to configure to existing system. Trenching and plumbing of piping to discharge potable water into existing clearwell reservoir. Integration and reconfiguration of the existing system to incorporate the new filtration units and controls. Programming for programmable logic control (PLC) and operator interface terminal (OIT) equipment.
CityWI
Posted
-
Nov 12, 2026
The Village of Rockland is seeking construction bids for wastewater treatment plant upgrades, including new or replacement pumps, a lift station, aeration and clarifier equipment, disinfection systems, electrical service, SCADA controls, and a laboratory/office/garage structure. Bids must be submitted through QuestCDN by November 12, 2026, at 2:00 PM CST; a non-mandatory pre-bid conference is scheduled for October 28, 2026, at the Village’s wastewater treatment facility. The project anticipates substantial completion by July 31, 2028, and final completion by December 29, 2028.
CityCA
Posted
Sep 29, 2026
Oct 28, 2026
The scope of work includes but is not limited to; Maintain existing WWTP during phases 1 and 2 of the site preparation and construction of new WWTP. Over excavation, soil stabilization, temp retaining wall, bypass pumping, demo and relocation of PG&E facilities, site grading, paving, yard piping, new access roads, perimeter fence and gates, all components for construction of new WWTP, demolition of existing WWTP.