CityCA
Posted
Sep 29, 2026
Oct 28, 2026
Wastewater Treatment Plant Upgrade Project, City of Greenfield
The scope of work includes but is not limited to; Maintain existing WWTP during phases 1 and 2 of the site preparation and construction of new WWTP. Over excavation, soil stabilization, temp retaining wall, bypass pumping, demo and relocation of PG&E facilities, site grading, paving, yard piping, new access roads, perimeter fence and gates, all components for construction of new WWTP, demolition of existing WWTP.
