Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Norwich, CT is soliciting bids for the construction of a new total trihalomethane (TTHM) removal system and appurtenant work for the existing Richard Brown Water Storage tank in Montville, Connecticut. Work includes replacing cathodic protection components, installing a combination free chlorine/pH analyzer and above‑grade cabinet, constructing a new 12‑foot by 10‑foot above‑grade structure, providing a new 30 kW diesel standby generator, and related site work. An optional pre‑bid site visit is scheduled for January 14, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide new total trihalomethane (tthm) removal system and appurtenant work for the existing richard brown drive water storage tank which is a 0.275 MG welded steel tank approx 82' in height with a dia of approx 24'.Additional work will include the replacement of the interior cathodic protection system components, a new combination free chlorine/pH analyzer, and above-grade cabinet, a new-above-grade 12' x 10' structure, a new 30 KW diesel driven standby generator and related site work.
Posted Date
Jan 6, 2026
Due Date
Feb 11, 2026
Release: Jan 6, 2026
Close: Feb 11, 2026
Provide new total trihalomethane (tthm) removal system and appurtenant work for the existing richard brown drive water storage tank which is a 0.275 MG welded steel tank approx 82' in height with a dia of approx 24'.Additional work will include the replacement of the interior cathodic protection system components, a new combination free chlorine/pH analyzer, and above-grade cabinet, a new-above-grade 12' x 10' structure, a new 30 KW diesel driven standby generator and related site work.
AvailableProvide water meters and appurtenances for the city on an "as needed" basis. All water meters shall be compatible with the current and approved ami system. Water meter sizes and types are: positive displacement (5/8" through 1"); turbine (1.5" through 10"); compound (1.5" through 10"); electromagnetic (5/8" through 10"); ultrasonic (5/8" through 10"); fire hydrant water meters (3"); fireline meters (3" through 10").
Posted Date
Jan 12, 2026
Due Date
Feb 5, 2026
Release: Jan 12, 2026
Close: Feb 5, 2026
Provide water meters and appurtenances for the city on an "as needed" basis. All water meters shall be compatible with the current and approved ami system. Water meter sizes and types are: positive displacement (5/8" through 1"); turbine (1.5" through 10"); compound (1.5" through 10"); electromagnetic (5/8" through 10"); ultrasonic (5/8" through 10"); fire hydrant water meters (3"); fireline meters (3" through 10").
AvailableWork includes construction of the water, sanitary sewer and drainage facilities and paving and appurtenances. Approx. 3,500 LF 6" through 8" water line and all appurtenances; approx. 3,500 LF of 8" sanitary sewer collection system; approx. 3,330 LF of 24" through 60" storm sewer and all appurtenances; approx. 8,376 SY of 6" subgrade preparation; approx. 341 SY of 8" subgrade preparation; approx. 11,962 SY of 6" reinforced concrete pavement; approx. 307 SY of 7" reinforced concrete pavement with "holland stone" interlocking pavers; etc; approx. 130 LF of earthen swale excavation.
Posted Date
Jan 23, 2026
Due Date
Feb 12, 2026
Consists of constructing a new reverse osmosis system, evaporation pad, finish water tank and all associated appurtenances at the existing water treatment facility site.
Posted Date
Dec 19, 2025
Due Date
Feb 5, 2026
Release: Dec 19, 2025
Close: Feb 5, 2026
Consists of constructing a new reverse osmosis system, evaporation pad, finish water tank and all associated appurtenances at the existing water treatment facility site.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of the water, sanitary sewer and drainage facilities and paving and appurtenances. Approx. 3,500 LF 6" through 8" water line and all appurtenances; approx. 3,500 LF of 8" sanitary sewer collection system; approx. 3,330 LF of 24" through 60" storm sewer and all appurtenances; approx. 8,376 SY of 6" subgrade preparation; approx. 341 SY of 8" subgrade preparation; approx. 11,962 SY of 6" reinforced concrete pavement; approx. 307 SY of 7" reinforced concrete pavement with "holland stone" interlocking pavers; etc; approx. 130 LF of earthen swale excavation.
Available