Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide new total trihalomethane (tthm) removal system and appurtenant work for the existing richard brown drive water storage tank which is a 0.275 MG welded steel tank approx 82' in height with a dia of approx 24'.Additional work will include the replacement of the interior cathodic protection system components, a new combination free chlorine/pH analyzer, and above-grade cabinet, a new-above-grade 12' x 10' structure, a new 30 KW diesel driven standby generator and related site work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Norwich, CT is soliciting bids for the construction of a new total trihalomethane (TTHM) removal system and appurtenant work for the existing Richard Brown Water Storage tank in Montville, Connecticut. Work includes replacing cathodic protection components, installing a combination free chlorine/pH analyzer and above‑grade cabinet, constructing a new 12‑foot by 10‑foot above‑grade structure, providing a new 30 kW diesel standby generator, and related site work. An optional pre‑bid site visit is scheduled for January 14, 2026.
Posted Date
Jan 6, 2026
Due Date
Feb 11, 2026
Release: Jan 6, 2026
Close: Feb 11, 2026
The City of Norwich, CT is soliciting bids for the construction of a new total trihalomethane (TTHM) removal system and appurtenant work for the existing Richard Brown Water Storage tank in Montville, Connecticut. Work includes replacing cathodic protection components, installing a combination free chlorine/pH analyzer and above‑grade cabinet, constructing a new 12‑foot by 10‑foot above‑grade structure, providing a new 30 kW diesel standby generator, and related site work. An optional pre‑bid site visit is scheduled for January 14, 2026.
AvailableProposals for the removal of an underground storage tank.
Posted Date
Jan 12, 2026
Due Date
Feb 4, 2026
Release: Jan 12, 2026
Close: Feb 4, 2026
Proposals for the removal of an underground storage tank.
The removal of two water storage tanks (60,000 and 30,000 gallons) and installation of one 135,000-gallon water storage tank.
Posted Date
Jan 16, 2026
Due Date
Feb 2, 2026
Release: Jan 16, 2026
Close: Feb 2, 2026
The removal of two water storage tanks (60,000 and 30,000 gallons) and installation of one 135,000-gallon water storage tank.
Underground storage tank removal mechanical.
Posted Date
Jan 4, 2026
Due Date
Feb 10, 2026
Release: Jan 4, 2026
Close: Feb 10, 2026
Underground storage tank removal mechanical.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis