Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Norwich Public Utilities's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Norwich Public Utilities
Provide new total trihalomethane (tthm) removal system and appurtenant work for the existing richard brown drive water storage tank which is a 0.275 MG welded steel tank approx 82' in height with a dia of approx 24'.Additional work will include the replacement of the interior cathodic protection system components, a new combination free chlorine/pH analyzer, and above-grade cabinet, a new-above-grade 12' x 10' structure, a new 30 KW diesel driven standby generator and related site work.
Posted Date
Jan 6, 2026
Due Date
Feb 11, 2026
Release: Jan 6, 2026
Norwich Public Utilities
Close: Feb 11, 2026
Provide new total trihalomethane (tthm) removal system and appurtenant work for the existing richard brown drive water storage tank which is a 0.275 MG welded steel tank approx 82' in height with a dia of approx 24'.Additional work will include the replacement of the interior cathodic protection system components, a new combination free chlorine/pH analyzer, and above-grade cabinet, a new-above-grade 12' x 10' structure, a new 30 KW diesel driven standby generator and related site work.
AvailableNorwich Public Utilities
Work includes providing new exterior and interior coatings systems on an existing 400,000 GAL spheroidal water storage tank, a new aeration and mixing system, a new equipment building, and other ancillary improvements. Work will also include providing a new aeration and mixing system to remove tthms from the potable water stored in the tank, including a new surface floating aerator, tank mixer, roof-mounted blower, and an equipment shed to house the new control panels and other electrical and scada equipment. Rehabilitation of the existing tank, including removal and disposal of existing coatings systems on all exterior steel surfaces and interior steel surfaces (i.e., interior surfaces of tank ball), providing new coatings systems on all exterior steel. See attached file.
Posted Date
Mar 21, 2025
Due Date
Apr 23, 2025
Release: Mar 21, 2025
Norwich Public Utilities
Close: Apr 23, 2025
Work includes providing new exterior and interior coatings systems on an existing 400,000 GAL spheroidal water storage tank, a new aeration and mixing system, a new equipment building, and other ancillary improvements. Work will also include providing a new aeration and mixing system to remove tthms from the potable water stored in the tank, including a new surface floating aerator, tank mixer, roof-mounted blower, and an equipment shed to house the new control panels and other electrical and scada equipment. Rehabilitation of the existing tank, including removal and disposal of existing coatings systems on all exterior steel surfaces and interior steel surfaces (i.e., interior surfaces of tank ball), providing new coatings systems on all exterior steel. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.