The Project will consist of repaving 17 separate street segments, 10 neighborhoods and 1 parking lot. Work will include grinding and removing existing asphalt and replacing the removed asphalt to prior grade, protecting manholes and valves, replacing existing striping, NPDES and AQMD compliance, and traffic control and resident/business notifications. The project will also include the removal and replacement of curb ramps per City of Indio Standard Plans No. 136 to bring them into compliance with current ADA standards. Work will include removal of existing concrete ramps, sidewalk, AC pavement, concrete pavement/cross-gutters, fine grading and compaction, construction of new curb ramps, sidewalk, AC pavement, concrete pavement/cross-gutters, traffic control and resident/business notifications.