Iowa Department of Agriculture and Land Stewardship
State AgencyIA
Posted
Nov 10, 2026
Dec 10, 2026
26-15 Winn971022B (Winneshiek) - Construction Nutrient Reduction Wetland RFP
In general, the work involves, but is not limited to, selective clearing, drain tile investigation and removal, excavation, grading, installation of high density polyethyelene (HDPE) pipe with CMP tile outlets, steel sheet pile installation, CMP water control structure, riprap and grout, seeding, and fence installation. This project includes around 35,150 CY of earthwork, 8,385 LF of drain tile investigaiton and removal, 16,230 LF of HDPE corrugated profile wall pipe installation, 2,344 SF of steel sheet pile installation, a corrugated metal water control structure, 188 CY concrete grout, 1,475 tons of riprap, 18.4 acres of seeding and 4,780 LF of fence installation.