26-10 Car833409A (Carroll) - Request for Bids
Posted
Sep 28, 2026
Oct 27, 2026
Project includes, but is not limited to, selective clearing, excavation and grading, along with tile and outlet structures, pump installation, tile installation, riprap placement, and seeding. This project includes around 19,861 total CY of earthwork, 835 LF of pipe installation, 29 tons of riprap, installation of a modified sw-513 concrete outlet structure, lift station consisting of a sw-401 concrete structure, solar pump system and 2.4 acres of seeding.