Iowa Department of Administrative Services
State AgencyIA
Posted
Nov 10, 2026
Dec 10, 2026
26-15 Winn971022B (Winneshiek) RFP
Construction nutrient reduction wetland
Description: In general, the work involves, but is not limited to, selective clearing, drain tile investigation and removal, excavation, grading, installation of high density polyethyelene (HDPE) pipe with CMP tile outlets, steel sheet pile installation, CMP water control structure, riprap and grout, seeding, and fence installation. This project includes around 35,150 CY of earthwork, 8,385 LF of drain tile investigaiton and removal, 16,230 LF of HDPE corrugated profile wall pipe installation, 2,344 SF of steel sheet pile installation, a corrugated metal water control structure, 188 CY concrete grout, 1,475 tons of riprap, 18.4 acres of seeding and 4,780 LF of fence installation.
StateAgency · IA, US
Adjacent opportunities open for bidding right now.
Iowa Department of Administrative Services
State AgencyIA
Posted
Nov 10, 2026
Dec 10, 2026
Construction nutrient reduction wetland
Iowa Department of Agriculture and Land Stewardship
State AgencyIA
Posted
Nov 11, 2026
Dec 10, 2026
In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheetpile installation, tile installation, CMP water control structure, stoplog storage structure, riprap with concrete grout, TURF reinforcement mat Tyope 5B, s and seeding. This project includes 18,151 CY of earthwork, 1,150 SF of steel sheetpile, 1,268 LF of pipe installation, 668 tons of riprap, 35 tons of 2" clean stone, CMP water control structure, CMP inlet riser, 72 CY of concrete grout, 430 SY of TURF mat Type 5B, 515 LF of silt fence and 5 acres of seeding.
Special DistrictIL
Posted
Sep 9, 2026
Dec 1, 2026
The project consists of six design packages and early work equipment pre-procurement. It encompasses extensive upgrades and structural repairs across multiple facilities, including West and East Headworks grit chambers, screen buildings, primary clarifiers, and sludge pumps. Key elements include the demolition of existing structures, installation of BNR compressors and aeration diffusers, upgrades to anaerobic/fermentation tanks, replacement of nitrification clarifier mechanisms, effluent pump station enhancements, primary digester lid and heat exchanger replacements, and lagoon revetment mat updates along with associated electrical and control systems integration.
CityMI
Posted
Nov 12, 2026
Dec 3, 2026
The Charter Township of Brighton seeks proposals to manufacture and install a new sign at a Township-owned nature area. This is a one-time project, with delivery requested as soon as possible. Questions are due November 24, 2026.
Decision makers connected to this RFP from Iowa Department of Agriculture and Land Stewardship.
Solicitation files and supporting documents for this bid.