CountyGA
Jul 6, 2026
Closes
Aug 3, 2026
2026 LRA Resurfacing RFP
Work includes approx 43,436.80 SY reclamation; 125,757.87 SY leveling and double chip and sand seal.
Description: Intersection improvement; resurfacing; minor base repairs; curb and gutter replacement; drainage improvements for approximately 3. 0 miles of roadway; work includes approximately 4,018 tons of bituminous concrete wearing layer; 125 tons of bituminous concrete binder/patching layer; and 45,372 sy of planing existing asphalt (includes alternate).
City · AL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to City of Foley.
Adjacent opportunities open for bidding right now.
CountyGA
Jul 6, 2026
Closes
Aug 3, 2026
Work includes approx 43,436.80 SY reclamation; 125,757.87 SY leveling and double chip and sand seal.
CityNJ
Jul 30, 2026
Closes
Aug 11, 2026
The project generally consists of hot mix asphalt pavement milling, furnishing and installation of dense graded aggregate base course, hot mix asphalt base course, and hot mix asphalt surface course, including sweeping, tack coating, and other pavement preparation and related work. The improvements also include the installation or removal and replacement of curbs, a. D. A. Accessible curb ramps, sidewalks and driveway aprons, driveway restoration, and all other associated work and services.
CountyGA
Jul 10, 2026
Closes
Aug 13, 2026
Forsyth County, Georgia is soliciting competitive bids under Invitation to Bid (ITB) #26-75-3150 from qualified vendors to provide all materials, equipment, labor, and machinery required for the 2026 Road Resurfacing Program covering approximately 55.31 miles of county roads. All asphalt job mix formulas must conform to Superpave Design Level '1'. Sealed electronic bids must be submitted through the County's Bonfire procurement portal by 2:00 PM EDT on August 13, 2026, with a questions deadline of 2:00 PM EDT on August 3, 2026.
South Carolina Department of Transportation
State AgencySC
Jul 7, 2026
Closes
Aug 11, 2026
Work includes borrow excavation 148.000 CY, maintenance stone 0.750 Ton, liquid asphalt binder pg64-22 73.485 Ton, aramid fiber 350.000 LB, full depth asph pav patching 8" unif 75.000 SY, milling existing asphalt pavement 2.0" 12,160.000 SY, milling existing asphalt pavement (variable) 500.000 SY, asphalt surface course type b 1,255.573 Ton, asphalt surface course type d 25.000 Ton, driveway paving-surface type d 43.125 Ton, permanent construction signs (ground mounted) 248.000 SF, 4" white broken lines -(gaps excluded)-fast dry paint 120.000 LF, 4" white solid lines (pvt edge lines)-fast dry paint 15,640.000 LF, 24" white solid lines (stop/diagonal lines)-fast dry paint 110.000 LF. See attached file.