Summary
Work includes borrow excavation 148.000 CY, maintenance stone 0.750 Ton, liquid asphalt binder pg64-22 73.485 Ton, aramid fiber 350.000 LB, full depth asph pav patching 8" unif 75.000 SY, milling existing asphalt pavement 2.0" 12,160.000 SY, milling existing asphalt pavement (variable) 500.000 SY, asphalt surface course type b 1,255.573 Ton, asphalt surface course type d 25.000 Ton, driveway paving-surface type d 43.125 Ton, permanent construction signs (ground mounted) 248.000 SF, 4" white broken lines -(gaps excluded)-fast dry paint 120.000 LF, 4" white solid lines (pvt edge lines)-fast dry paint 15,640.000 LF, 24" white solid lines (stop/diagonal lines)-fast dry paint 110.000 LF. See attached file.