CityWI
Posted
Sep 17, 2026
Sep 30, 2026
Church Street and Maple Street Asphalt Mill and Overlay RFP
The project consists of milling approx. 2" of existing asphalt pavement and replacing it with approx. 2" of new hot-mix asphalt pavement. The existing roadway consists of two 11' travel lanes, for a total paved roadway width of approx. 22'. The proposed asphalt mix shall be a 4 LT mix design, subject to confirmation of the applicable Wisconsin Department of Transportation specifications and project requirements. The project includes the following road segments: Church Street - Limits: Elm Street to Maple Street. Approx. length: 293 LF. Existing roadway: Two 11' travel lanes. Existing paved shoulders: Approx. 2' on one side. Approx. 10' on the opposite side. Work: Mill and remove approx. 2" of existing asphalt and replace with approx. 2" of new 4 LT hot-mix asphalt. The contractor shall verify all existing roadway dimensions, project limits, and field conditions before submitting a bid. Maple Street. Limits: County Road J to County Road A. Length: Contractor shall verify the total length of this segment in the field and provide a unit-price bid based on the actual measured quantities. Existing roadway: Two 11' travel lanes. Work: Mill and remove approx. 2" of existing asphalt and replace with approx. 2" of new 4 LT hot-mix asphalt.