CityPA
Posted
Aug 31, 2026
Sep 18, 2026
North Bridge Street Mill and Overlay RFP
Approx. 3,008 SY of 1 1/2" milling of North Bridge Street roadway and the furnishing and placement of approximately 3,008 SY of 1 1/2" bituminous material overlay.
Description: The project consists of milling approx. 2" of existing asphalt pavement and replacing it with approx. 2" of new hot-mix asphalt pavement. The existing roadway consists of two 11' travel lanes, for a total paved roadway width of approx. 22'. The proposed asphalt mix shall be a 4 LT mix design, subject to confirmation of the applicable Wisconsin Department of Transportation specifications and project requirements. The project includes the following road segments: Church Street - Limits: Elm Street to Maple Street. Approx. length: 293 LF. Existing roadway: Two 11' travel lanes. Existing paved shoulders: Approx. 2' on one side. Approx. 10' on the opposite side. Work: Mill and remove approx. 2" of existing asphalt and replace with approx. 2" of new 4 LT hot-mix asphalt. The contractor shall verify all existing roadway dimensions, project limits, and field conditions before submitting a bid. Maple Street. Limits: County Road J to County Road A. Length: Contractor shall verify the total length of this segment in the field and provide a unit-price bid based on the actual measured quantities. Existing roadway: Two 11' travel lanes. Work: Mill and remove approx. 2" of existing asphalt and replace with approx. 2" of new 4 LT hot-mix asphalt.
City · WI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityPA
Posted
Aug 31, 2026
Sep 18, 2026
Approx. 3,008 SY of 1 1/2" milling of North Bridge Street roadway and the furnishing and placement of approximately 3,008 SY of 1 1/2" bituminous material overlay.
CityPA
Posted
Sep 10, 2026
Sep 24, 2026
Work includes approx 1,850 SY 1 1/2" milling of asphalt pavement surface; 1,850 SY superpave asphalt mixture design.
CityOH
Posted
Sep 8, 2026
Oct 5, 2026
Preparation of construction contract plans for the Church Street Overpass Rehabilitation, including complete deck replacement and new approach slabs.
CityMA
Posted
-
Sep 23, 2026
The Town of Acton is soliciting bids for demolition of the steel canopy at the 19-21 Maple Street Commuter Lot. The solicitation is listed in Massachusetts COMMBUYS under bid number BD-27-1693-420HW-420HW-132911 and describes demolition work rather than a grant program. Bids are due on September 23, 2026, at 10:00 AM.
Decision makers connected to this RFP from Village of Almond.