Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pedestrian and bike improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work to be performed in general consists of pavement and concrete repair, sidewalk infill at pedestrian gap locations, type II slurry seal and new striping.
Posted Date
Jan 2, 2026
Due Date
Feb 12, 2026
Release: Jan 2, 2026
Close: Feb 12, 2026
Work to be performed in general consists of pavement and concrete repair, sidewalk infill at pedestrian gap locations, type II slurry seal and new striping.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the construction of new on-street bike lanes, 10-foot-wide multi-use sidewalk, and associated pedestrian and bicycle improvements including drainage infrastructure.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Project includes the construction of new on-street bike lanes, 10-foot-wide multi-use sidewalk, and associated pedestrian and bicycle improvements including drainage infrastructure.
AvailableProvide bike and pedestrian corridor improvements. Work will include lighting, storm drain, landscape, traffic signal improvements, potential pavement preservation, and other roadway safety measures. Asphalt concrete pavement milling (1" depth) 10,395. 00 sq yd, asphalt concrete pavement milling (2" depth) 1,349. 00 sq yd, subgrade preparation 4,844. 00 sq yd, aggregate base course 753 cu yd, asphalt concrete surface course, type d 1/2 1,751. 00 ton, asphalt concrete surface course, type c 3/4, 3" thick 646 ton, portland cement concrete pavement, class a, 9" thick 1,036. 00 sq yd, emulsified asphalt for tack coat, type ss-1h 24 ton. See outside link or attached files.
Posted Date
Jan 15, 2026
Due Date
Feb 17, 2026
Release: Jan 15, 2026
Close: Feb 17, 2026
Provide bike and pedestrian corridor improvements. Work will include lighting, storm drain, landscape, traffic signal improvements, potential pavement preservation, and other roadway safety measures. Asphalt concrete pavement milling (1" depth) 10,395. 00 sq yd, asphalt concrete pavement milling (2" depth) 1,349. 00 sq yd, subgrade preparation 4,844. 00 sq yd, aggregate base course 753 cu yd, asphalt concrete surface course, type d 1/2 1,751. 00 ton, asphalt concrete surface course, type c 3/4, 3" thick 646 ton, portland cement concrete pavement, class a, 9" thick 1,036. 00 sq yd, emulsified asphalt for tack coat, type ss-1h 24 ton. See outside link or attached files.
AvailablePedestrian improvements to highway.
Posted Date
Jan 17, 2026
Due Date
Jan 27, 2026
Release: Jan 17, 2026
Close: Jan 27, 2026
Pedestrian improvements to highway.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →