Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work to be performed in general consists of pavement and concrete repair, sidewalk infill at pedestrian gap locations, type II slurry seal and new striping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Pedestrian and bike improvements. Work includes clearing and grubbing; 1,175 SY of solid slab sodding; 330 SY of P.C. concrete pavement; 177 LF of combined curb and gutter (6" barrier); 54 LF of combined curb and gutter (8" barrier); 1,534 SY of 4" concrete sidewalk; 15 SY Of 5" concrete sidewalk; 160 SF of tactile warning device new; 10 LF of 42"x29" corrugated galvanized steel pipe arch; 996 LF of sawing pavement. See attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 15, 2026
Pedestrian and bike improvements. Work includes clearing and grubbing; 1,175 SY of solid slab sodding; 330 SY of P.C. concrete pavement; 177 LF of combined curb and gutter (6" barrier); 54 LF of combined curb and gutter (8" barrier); 1,534 SY of 4" concrete sidewalk; 15 SY Of 5" concrete sidewalk; 160 SF of tactile warning device new; 10 LF of 42"x29" corrugated galvanized steel pipe arch; 996 LF of sawing pavement. See attached file.
AvailablePedestrian/ bike facilities greenbrier ADA ramps.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Pedestrian/ bike facilities greenbrier ADA ramps.
AvailablePedestrian Safety Improvements.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Pedestrian Safety Improvements.
Available1 LS clearing and grubbing; 1,317 CY unclassified excavation; 4,807 SY solid slab sodding; 114 SY full depth PCC patch (placement); 1,457 SY of 5" conc sidewalk; 253 LF of 28" X 18" RC pipe arch, cl A-III; 241 SF sheet aluminum signs; 10 SD port changeable message sign. Project length = 1.18 miles. See attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
1 LS clearing and grubbing; 1,317 CY unclassified excavation; 4,807 SY solid slab sodding; 114 SY full depth PCC patch (placement); 1,457 SY of 5" conc sidewalk; 253 LF of 28" X 18" RC pipe arch, cl A-III; 241 SF sheet aluminum signs; 10 SD port changeable message sign. Project length = 1.18 miles. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →