Work consist of constructing approx 7,000 LF of concrete 7' and 8' sidewalk to create a continuous pedestrian network. In addition to sidewalk improvements, road will be milled, overlayed, and restriped with new pavement markings and bike lanes to increase pedestrian safety. Work includes approx. 1.48 AC clearig & grubbing, 1 LS limb trimming, 1 LS site excavation, 5,000 SY 8" pavement patching, 450 LF 2" PVC conduit, 320 LF furnish additional conduit within directional bore, 320 LF 2" HDPE conduit, 1 EA fiber optic install, 1,010 LF sawcut for loop detector, 365 SF retaining wall, 55 LF aluminum handrail, 4 LF adjust manhole, 741 LF6" concrete bridge curb, 1.62 AC permanent vegetation, 2 EA hydrant relocate, 5 EA relocate water meter, 2 EA relocate light pole, 4 EA bus stop shelter, See attached file.