Work includes includes the relocation of approx. 2500 LF of 14" water main with 16" sdr18 PVC C-900 water main, largely installed by horizontal directional drilling methods, along the west side of Epworth road north of Lincoln avenue and the east side of Epworth road south of Lincoln avenue. This includes all applicable fittings, taps, valves, hydrants, and service reconnections as required in the plans. The project also includes alternate a for the relocation of approx. 1950 LF of 6" water main with 8" SDR18 PVC C-900 water main, largely installed by horizontal directional drilling methods, along the east side of Epworth road between county road 450 S (Lockwood lane) to just south of Chippewa drive. Alternate a also includes all applicable fittings, taps, valves, hydrants, and service reconnections as required in the plans.