Special DistrictMA
Posted
Nov 12, 2026
Dec 17, 2026
Sleepy Hollow Road Bridge Replacement Project RFP
Work includes 1,150 CY 140. - bridge excavation; 215 CY 151.2 - gravel borrow for backfilling structures and pipes; 470 CY 151. - gravel borrow; 30 TON 156. - crushed stone; 45 ton 156.1 - crushed stone for bridge foundations; 191 SY 170. - fine grading and compacting - subgrade area; 50 CY 402. 01 - dense graded crushed stone for surface; 50 LF 620.12 - guardrail, tl-2 (single faced); 150 LF 657. - temporary fence; 360 SY 698. 3 - geotextile fabric for separation; 45 cy 751. - loam for roadsides; 80 SY 751. 7 - compost blanket; 158 SF 852. - safety signing for traffic management. See attached file.
