The Delaware River Joint Toll Bridge Commission (the "Commission") invites proposals from Consultants for professional engineering services to perform inspections of the Commission's Bridges and associated facilities within the Commission's jurisdiction and to submit reports including inspection findings and recommendations. The bridge inspections, as well as nondestructive testing (NDT) services of bridge pins located on selected Commission bridges, are to be performed under generally accepted NBIS (National Bridge Inspections) standards. The Commission owns and operates 20 bridge crossings over the Delaware River and 34* approach structures from Morrisville, Pennsylvania on the south to Milford, Pennsylvania approximately 140 miles to the north. Of the main river crossings, eight (8) are Toll Bridges and the remaining 12 are "Toll Supported Bridges" (tolls are not collected on these bridges). Two (2) of the 12 Toll Supported bridges are pedestrian bridges.
These inspections will include all facilities owned by the Commission in connection with the scheduled bridges whether they are immediately adjacent or contiguous to the scheduled bridges. The facilities to be inspected include, but are not limited to; approach roadways and highways, toll plazas, entrance plazas, overpasses, underpasses, sign structures and appurtenances, all administration, service, shelters and storage buildings and any other property within the Commission's jurisdiction. All Fracture Critical bridges will require an FCM inspection in accordance with NBIS. Inspection services also include professional engineering services to perform nondestructive testing (NDT) services of bridge pins located on selected Commission bridges.
Special access equipment, including safety boat, and traffic control required for the inspections will be provided by the Commission, with the exception of the Easton-Phillipsburg Toll Bridge, where the Consultant will be required to provide their own access to upper levels of the above deck truss and pins.
The eight (8) Toll Bridge facilities and corresponding number of structures are:
1. Trenton - Morrisville Toll Bridge and twelve (12) approach structures
2. Scudder Falls Toll Bridge two (2) parallel structures, two (2) approach structures and two (2) pedestrian ramp structures
3. New Hope - Lambertville Toll Bridge and two (2) approach structures
4. Interstate 78 Toll Bridge (twin structures) and eleven (11) approach structures
5. Easton - Phillipsburg Toll Bridge and four (4) approach structures plus a pedestrian tunnel
6. Portland - Columbia Toll Bridge and two (2) approach structures
7. Delaware Water Gap Toll Bridge (twin structures)
8. Milford - Montague Toll Bridge
The 12 Toll Supported bridge facilities and corresponding number of structures are:
1. Lower Trenton Toll-Supported Bridge
2. Calhoun Street Toll-Supported Bridge
3. Washington Crossing Toll-Supported Bridge
4. New Hope - Lambertville Toll-Supported Bridge
5. Centre Bridge - Stockton Toll-Supported Bridge and one (1) approach structure
6. Lumberville - Raven Rock Toll-Supported Pedestrian Bridge
7. Uhlerstown - Frenchtown Toll-Supported Bridge
8. Upper Black Eddy - Milford Toll-Supported Bridge
9. Riegelsville Toll-Supported Bridge
10. Easton - Phillipsburg (Northampton Street) Toll-Supported Bridge
11. Riverton - Belvidere Toll-Supported Bridge
12. Portland - Columbia Toll-Supported Pedestrian Bridge
Bridge pin testing includes the following bridges and the following inspection schedule: 2028 - New Hope - Lambertville Toll Bridge (US 202) (16 hanger assembly pins) 2028 - Easton-Phillipsburg Toll Bridge (US 22) (74 truss pins) 2030 - New Hope Lambertville Toll Supported Bridge (216 truss pins) 2032 - Calhoun Street Toll-Supported Bridge (252 truss pins - Wrought Iron) 2034 - Northampton Street Toll-Supported Bridge (98 truss pins) 2036 - Riegelsville Toll-Supported Bridge (8 suspension cable pins) 2036 - Lumberville-Raven Rock Pedestrian Bridge (8 anchorage pins)
In addition to the main river crossing bridges, their approach spans and/or bridges and associated highway and ramp approaches, there are administration/operation buildings, maintenance shops and garages. In addition, the Commission owns a stand-alone maintenance facility, serving the Scudder Falls Toll Bridge facility, located at 2400 Big Oak Road, Langhorne, Pennsylvania 19047.
Available for review at the Commission's Administration Building in Yardley, PA are internal documents containing general information of the Commission's facilities identified above, entitled "General Information on Non-Toll Bridges" and "General Information on Toll Bridges". These documents include general information on the buildings, shops, and garages at the toll facilities.
As used in this RFP the term "Consultant" shall mean the Prime Consultant, the consulting firm with which a Consultant is affiliated (if any) and the respective sub-consultants of the foregoing that jointly comprise the team to be used for this Agreement as defined below.
In accordance with the Commission's requirements, all bridges and facilities within the Commission's jurisdiction must be inspected at least once every two (2) years or more often if warranted due to the condition. The Commission's Toll Bridges and their related facilities will be inspected in 2027 (May - August) followed by the Commission's Toll-Supported Bridges and their facilities being inspected in 2028 (April - June). All Toll-Supported Bridges with weight restrictions will require interim inspections in 2027. In addition, Non-Destructive Pin Testing shall be performed in accordance with the pin testing inspection schedule, for those bridges scheduled within this contract period.
The Contract will be for a two (2) year period. The not-to-exceed dollar amount for this General Engineering Consultant - Annual Inspection 2027 - 2028 for the two-year period will be $550,000.00. In addition, the not-to-exceed dollar amount for the Non-Destructive Pin Testing is provided in Table 1 below, for the given two-year period. After review of the proposals, the Commission will select a consultant and negotiate the scope of work and fee for each year's inspections separately. The contract also includes an option for up to two (2) additional two (2) year inspection and testing cycles. This option will be exercised at the discretion of the Commission for an amount to be negotiated with the Consultant.
Table 1 - Not-to-Exceed Dollar Amount for the Non-Destructive Pin Testing
YEAR BRDGE NO. OF PINS DOLLAR AMMOUNT
2027 New Hope - Lambertville Toll Bridge (US 202) 16 hanger assembly pins $220,000 2028 Easton-Phillipsburg Toll Bridge (US 22) 74 truss pins
2029 New Hope Lambertville Toll Supported Bridge 216 truss pins $460,000 2030
2031 Calhoun Street Toll-Supported Bridge 252 truss pins - Wrought Iron $180,000 2032
2033 Northampton Street Toll-Supported Bridge 98 truss pins $225,000 2034
2035 Riegelsville Toll-Supported Bridge 8 suspension cable pins $50,000 2036 Lumberville - Raven Rock Pedestrian Bridge 8 anchorage pins
This Request for Proposal ("RFP") is for performing inspections in order to recommend proper maintenance, capital program projects such as rehabilitations and improvements, and equipment replacement and upgrades. The services shall include the preparation of an Annual Inspection report for 2027 and 2028 and the Annual Maintenance Report for 2027 and 2028. The report will need to present the findings in such a way that it be easily understood by the general public.
The intent of this RFP is for the Commission to select a Prime Consultant, based on their proposal submission and in accordance with the Task Order/Term Agreement process outlined in the Procurement Process Guidelines for Professional Services Consultants for the Commission's Capital Program. A copy of the guidelines is available from the Commission.
To respond to this RFP, the Prime Consultant must have an office located within a 2-hour drive of the Commission's Administration Building located in Yardley, PA. The Prime Consultant's Project Manager must be assigned to the same office and must be a licensed Professional Engineer in the State of New Jersey and/or Commonwealth of Pennsylvania.
On November 29, 2004 the Commission adopted Guidelines on Conflict of Interest and Recusal. Consultants must include in their proposal a certification in the form of the Conflict of Interest and Recusal Certification Form (Attachment IV) indicating that they have read, understood and will comply with these guidelines when performing work for the Commission.
Consultants responding to this RFP can be prequalified by NJDOT in B-1: Bridge Design and I-5: Bridge Inspection - Complex, or PennDOT technical disciplines: Bridge Inspection and Structure Design, or demonstrate a commensurate level of experience in these fields. If currently prequalified, Consultants are requested to provide a copy of their latest Consultant Prequalification Form from NJDOT attesting that they have been prequalified in the foregoing required disciplines. Also, all sub-consultants shall demonstrate, in the proposal, project experience in the areas of work they will be performing.
Consultants are not required to be prequalified by PennDOT or NJDOT in the aforementioned disciplines, however are requested to submit current PennDOT or NJDOT certificates in these technical disciplines if available.
The consultant teams responding to this RFP which can provide the necessary staff as required to perform the services described herein are encouraged to submit a Proposal. Each Proposal submitted must meet the requirements stipulated herein, and the submitting Consultant must agree to the terms and conditions, set forth in Administrative and Contractual Information (Attachment I) of this RFP.
The Consultant's organization must include the following key personnel:
Project Manager - Project Manager (PM) shall be a Professional Engineer in the State of New Jersey and/or the Commonwealth of Pennsylvania with a minimum of 10 years of Bridge Inspection and Bridge Design Supervision/Management experience. The PM is the individual who is the single point of contact and the Prime Consultants direct representative to the Owner. The PM must be an employee of the Prime Consultant. PM duties include, but are not limited to, coordinating its activities with the Commission staff, providing appropriate Bridge/Facilities inspection staff and overseeing the quality of work provided by the staff; and is the individual who directly supervises the Inspection Team Leader, support staff and sub-consultants. The Project Manager shall coordinate with the Commission to assign staffing based on the scope, needs and schedule.
Team Leader (Bridge Inspections) - The consultant shall provide an Inspection Team Leader with qualifications and experience to satisfy NBIS and a Quality Control Engineer with the following qualifications: Successful completion of FHWA approved comprehensive bridge inspection training; and completion of periodic bridge inspection refresher training according to New Jersey and Pennsylvania State policy; and current PE license/registration in New Jersey and/or Pennsylvania. Moreover, the Inspection Team Leader shall have experience on similar multi-span and Fracture Critical steel bridges, and have successfully completed NHI approved training courses: 'Fracture Critical Inspection Techniques of Steel Bridges', and 'Bridge Inspection Nondestructive Evaluation' within the last 10 years. The Team Leader must be an employee of the Prime Consultant.
Team Leader (NDT Pin Testing) - At a minimum, teams performing testing of bridge pins shall be lead by ASNT Level II NDT certified specialists, with experience on other similar projects.
Architect - The Architect shall be a Registered Architect in the State of New Jersey and/or Pennsylvania, with a minimum of 15 years of Building and Facility Design experience. The Architect is not required to be an employee of the Prime Consultant.
Identified Business Enterprise (IBE) Participation
Firms submitting a proposal for this solicitation agree to abide by the Commission's Contract Compliance Program (CCP) Requirements. The Commission's CCP is intended: (1) to promote and encourage minority, women, small, disadvantaged, disabled, and veteran owned businesses (referred to as "Identified Business Enterprises" or "IBEs") to participate in business opportunities with the Commission; (2) to afford IBEs an equal opportunity to compete for work on the Commission's contracts; and (3) to encourage consultants to provide subcontracting opportunities to certified IBEs by soliciting such firms for subcontracting opportunities. The Commission and its consultants shall not discriminate on the basis of race, color, religion, gender, national origin, ancestry, age, marital or veteran status, medical condition, disability, sexual orientation, citizenship, or any other classification protected by law in the award and performance of contracts.
The Commission encourages Consultants to meet or exceed the twenty-five percent (25%) IBE participation target for Commission contracts. However, Consultants may comply without achieving the participation targets so long as they make and document Good Faith Efforts (as that phrase is defined herein) that would allow IBE participation. Consultants that do not meet the project's targets are subject to the Contract Compliance Department's ("CCD") Good Faith Efforts review.
To comply with the Contract Compliance Program, a Consultant has two (2) options: (1) Compliance Plan I - the Consultant may "Opt-In" and complete forms A and B by agreeing to meet or exceed the 25% participation target, or (2) Compliance Plan II - the Consultant may provide its Good Faith Efforts documentation (forms A through F) detailing their attempt to meet the 25% participation target. The Contract Compliance Program's guidelines and forms are more fully explained and available directly from the Commission under Doing Business.
Any questions regarding preparation of the Compliance Plan should be directed to the CCD to the following: Professional Services Mr. Nicholas Haynes Director of Contract Compliance 1199 Woodside Road Yardley, PA 19067 (267) 394-6564 (office)
IBE Payment Verification
The Commission uses a Payment Verification System as a tool to improve communication between Prime Consultants and Sub-consultants in the compliance, documentation and reporting of payments to Sub-consultants.
The Commission requires all awarded Prime Consultants to familiarize themselves with and use the Payment Verification System in reporting monthly invoice payments to their Sub-consultants. The Prime Consultant agrees as part of the contract award to fulfill the mandatory requirements of the Commission's Payment Verification System.
The Prime Consultant must register and take online training with the Commission's Payment Verification System, for Payment to all IBE Sub-consultants.
SCOPE OF SERVICES
In general, the scope of services to be performed by the selected Consultant for this Project shall include:
I. General Activities of Consultant
A. Project Management
The Consultant will be responsible to prepare and submit monthly progress reports indicating weighted percent complete per task and percent complete based on hours spent per task. These progress reports shall be submitted along with the Prime Consultant's monthly invoices. The Prime Consultant shall submit these invoices within 15 business days after the end of each billing period.
B. Project Specific Quality Assurance Plan (PSQAP)
A PSQAP should be prepared and submitted to the Commission prior to beginning the annual inspections.
C. Coordination and Meetings
The coordination portion of this task includes general coordination with the Commission's Chief Engineer, Program Manager, Project Manager, and Engineering Department. The Consultant's Project Manager will prepare Agendas prior to and minutes after all meetings and submit them to the Commission for review. The Commission shall be informed of all meetings with other agencies, government officials, and / or groups so that Commission staff can attend if necessary.
II. Bridge & Facility Inspections / Pin Testing
A. Previous Inspection and Project Documentation Research
The consultant will review all prior inspection field notes, reports, rehabilitation plans, and all associated materials necessary in advance of the Inspections / Pin Testing
B. Bridge Inspection
Inspect bridges in accordance with current accepted NBIS standards.
C. Update Bridge Load Ratings (if condition warrants).
If during the inspections any conditions are found which are found to be inconsistent with the current load ratings, or controlling member deterioration is noted to have worsened, the Consultant will recommend that existing load ratings be updated.
D. Facility Inspections
The Facility Inspections will include all approach roadways, storm water inlets and outflows, entrance plazas, overpasses, underpasses, sign structures and other appurtenances, all administration, service and storage buildings and any other storage or residential dwelling structures under the Commission's jurisdiction. A general assessment of the building systems such as electrical, mechanical and HVAC systems will also be performed.
E. Sign Reflectivity Assessment
Perform a night time visual assessment of the reflectivity of all vehicle Commission's signs under the maintenance jurisdiction of the DRJTBC, in accordance with the 11th Edition, with current revisions, of the Manual on Uniform Traffic Control Devices (MUTCD) requirements.
F. Inspection and Testing of Pins
All labor, materials and equipment required for the inspection and testing shall be provided by the Consultant. Special access equipment, including safety boat, and traffic control required for the inspections will be provided by the Commission. The Consultant shall remove and replace pin nuts and caps as required for the inspection and testing, clean/prepare surfaces to be tested, repaint disturbed areas, and properly disposal of paint waste and paint chips.
Visual inspection shall be performed for each pin identified for testing and visual conditions shall be reported. Photo documentation shall be taken of general conditions and of defects that are visible.
The purpose of the non-destructive testing (NDT) is to ascertain the pin length, diameter, variations in pin diameter and any other flaws in the pins, including cracks, inclusions, voids and maximum section loss within 1/8" tolerance.
Pin testing shall be in accordance with recommended practices of AASHTO and PennDOT and NJDOT, among other industry norms. Understanding there are different methods of ultrasonic testing (UT), the Consultant shall submit their recommendation for comprehensive flaw detection plus accurate sizing. The recommendations for pin inspection and testing shall be detailed and specific regarding methodology and procedures for the pin testing, including but not limited to; personnel performing UT and their certifications, method(s) of UT testing, apparatus, equipment, calibration, reference standards, test result records, and equipment required to best meet the project needs. Provide a comparison of available UT testing methods and their alignment with AASHTO, PennDOT and NJDOT requirements, along with pros and cons of each to support recommended approach.
A site-specific plan shall be developed for each bridge location to demonstrate sequence and timeline of work at each bridge location.
Surface Preparation, Cleaning and Painting Test Locations
This work shall be in accordance with Section 1071 of PennDOT Publication 408 (Latest Edition), unless noted otherwise, and Section 1072 of PennDOT Publication 408 (Latest Edition).
Provide a 3-coat system as specified in Section 1071.
Provide a procedure for cleaning and painting of pin locations, as required for the proposed UT method(s), including the approach to collection, containment, and disposal of waste.
As a minimum, prepared surfaces shall be suitable for testing and for repainting. Surface preparation shall be in accordance with SSPC SP-11, Power-Tool Cleaning to Bare Metal, or better. Paint debris shall be contained, collected and disposed of properly. The duration of time when any bare metal is exposed must be minimized. The Consultant shall provide a proposed sequence and schedule for the work at each bridge which demonstrates this.
Finish Coat Color shall be Federal Standard 595B Color Number 24223 Bridge Green.
The Consultant shall identify the organization that will perform the surface preparation, cleaning and painting scope requirements in support of the UT testing and provide their qualifications. This work, or portions thereof, can be performed by a third party, as a direct cost.
III. Bridge & Facility Inspection Reports
A. Annual Bridge & Facility Inspection Report
The Annual Inspection Reports will include recommendations required to maintain and improve the Commission's bridges and facilities. The report format will follow the format of the previous Annual Inspection Report and will include a list of major items of work anticipated in the next five (5) years with a forecast of the Commission's future capital project needs.
B. Annual Maintenance Report
The Annual Maintenance Reports will include detailed descriptions of the deficiencies noted during the inspection which are in need of repair. The report format will follow the prior year's format, including updated condition photos. The report will include the Interim Inspection Reports. The recommended repairs will be coded and grouped in accordance with the Commission's Engineering Department Policy & Procedure 05-05 "Bridge Repair Priority Codes".
C. Cost Estimates and Support Data
To supplement the Annual Inspection and Maintenance Reports, the Consultant will provide the Commission with yearly cost estimates for repairs and yearly replacement costs for buildings and bridges for Commission insurance purposes. The Consultant will coordinate and implement approved capital plan worksheets into the Final Annual Inspection Report. Consultant will provide other support data as necessary/requested.
D. Pin Testing Assessment and Recommendations Report
The Consultant is required to submit a separate Pin Testing Assessment and Recommendations Report for each bridge identified. Visual inspection, test results and findings shall be documented in the Pin Testing Assessment and Recommendations Report and include sufficient photographs to clearly identify conditions and findings.
The Pin Testing Assessment & Recommendations Reports shall include, but not limited to, an Executive Summary of conditions and findings, a Table of "Significant" Findings, an outline of the scope of the inspection, documentation of all findings at each bridge pin, and clearly explain the NDT data that is being presented for each bridge pin. Follow documentation and reporting protocol guidance per AASHTO, PennDOT and NJDOT as applicable. The stand-alone bridge reports will include an individual sheet for each pin, indicating the dimension of the pin and clearly define observed defects (e.g. crack, section loss, or any other flaw) and give its location and extent. The individual pin sheets are to include end views and elevation view of the pin and identify defects using a numbering system with accompanying description of each defect. Each stand-alone bridge report should also make recommendations for condition rating changes, necessary repairs, an engineer's estimate of the repairs/replacements, and future monitoring activities (if warranted). All findings of defects, deficiencies, deterioration and/or anomalies shall be accompanied by recommendations.
Additionally, the following tasks shall be included: Convert BMS2 data for the Toll Bridges to BMS3; convert COMBIS/Inspect Tech SI&A data to NJDOT SI&A for approach structures in New Jersey (not including border bridges); update PennDOT BMS3 and NJDOT SI&A files; occasional updates of BMS2 and/or SI&A files using information provided by other consultants; collecting and updating element level bridge inspection data; occasional bridge load rating analysis updates; identify fracture critical bridges, members, and fatigue-prone details and provide sketches; perform intensive inspection of fracture critical members; recommend further testing/repairs as warranted. Underwater inspections are not included.
SUBMISSION REQUIREMENTS
The Consultant will be required to submit their Proposal electronically (no hardcopy submission) via email to the Project Manager with a copy to the Chief Engineer and the Program Area Manager. The submission must include the following:
Technical Proposal
1. Letter of Transmittal [not to exceed one (1) single-sided, letter-sized (8 1/2" x 11") page]. The Prime Consultant shall include within this Letter of Transmittal an affirmative statement that it has read/understood and will accept the Terms and Conditions of the Sample Standard Commission Consultant Agreement (Attachment V); indicate that it shall comply with the Insurance and Indemnification Requirements (Attachment II)
2. Proposal [not to exceed five (5) single-sided, letter-sized pages, using a minimum #11 font] shall include a narrative describing the Consultant's: a) Understanding of the Project and Commission Needs (including commitment to meet/exceed IBE goals); b) Approach to the Project and QA/QC Procedures (methodology, innovative activities, schedule; draft inspection report due within six months from NTP; complete inspections and related reports within eight months of NTP); c) Consultant's Experience on Similar Projects with at least three client references; d) Rate Schedule (average and maximum rates for term of two-year agreement -- not included in 5-page limit); e) Credentials/Experience of the Project Team (biographical narratives/matrix; Project Manager references); f) IBE Participation forms and certifications (not included in 5-page limit).
3. Prime Consultant's GSA Form 255 or GSA Form 330 in lieu of Form 255, with specified content (office location, personnel counts, resumes, project descriptions, etc.).
4. One (1) single-sided page Sample Certificate of Insurance indicating ability to meet insurance requirements shown in Attachment II.
5. Completed Broker Letter by the Prime Consultant only.
6. Completed Insurance and Indemnification Certification Form (Attachment III).
7. Completed Conflict of Interest and Recusal Certification Form (Attachment IV).
8. Rate Schedule: Provide average and maximum direct hourly rates for listed personnel categories for term of Agreement, multiplier not-to-exceed 2.75, overhead guidelines, no airfare/per diem, no sub-consultant mark-ups, monthly payment procedures, sample invoice template requirements. Note that anything in excess of page limitations or other media beyond specified will not be read or considered; incomplete proposals may be rejected.
PROPOSAL SCHEDULE
Post RFP on website November 12, 2026
Pre-Proposal Submission Meeting November 19, 2026
Closing Date for Submittal of Inquiries December 3, 2026
Response to Inquires December 7, 2026
Closing Date for Submission of Proposal December 17, 2026
Oral Interviews (if required) January 21, 2027
Anticipated Notice of Award February 22, 2027
ADMINISTRATIVE AND CONTRACTUAL INFORMATION
Technical Proposals must be delivered to the Commission electronically in separate bookmarked and searchable PDF files, prior to the time and date specified. The Proposal will be evaluated using selection criteria including understanding of the project, approach/QAQC, experience, rate schedule, credentials, and IBE participation. Oral presentations (if required) will be held at the Commission's Administration Building in Yardley, Pennsylvania and will be evaluated on technical content and team performance. Technical Proposal weight is 60% and Oral Presentations 40% in overall evaluation. There will be no debriefings for unsuccessful responders. Proposals must be submitted by 2:00 PM Local Time on the closing date and delivered via email only to the Chief Engineer with a copy to the Program Manager. A virtual pre-proposal meeting will be held at 10:00 AM on the date indicated in the Proposal Schedule; interested consultants should contact the Program Manager at least one business day in advance to receive a link to the virtual meeting. Inquiries concerning this RFP are to be submitted in writing via email to the attention of the Program Manager and the Chief Engineer; the inquiry deadline is 3:00 PM local time on the date indicated in the Proposal Schedule. Consultants are fully responsible for successful delivery of their email proposal. All Attachments (seven) to this RFP are incorporated by reference and made a part of this RFP.
Additional attachments include Administrative and Contractual Information; Insurance and Indemnification Requirements; Insurance and Indemnification Certification Form; Conflict of Interest and Recusal Certification Form; Sample Standard Commission Consultant Agreement; Rate Schedule; Quality Assurance Form. Detailed Sample Standard Commission Consultant Agreement and insurance requirements are included in the RFP document.
Very truly yours,
KEVIN M. SKEELS, P.E.
Chief Engineer