I-78 Toll Bridge Main River Bridges Cleaning and Painting
Posted
Sep 10, 2026
Oct 22, 2026
Work includes approx 745 LF of asphalt joint and crack sealing for concrete surfaces; 195 SY cement concrete sidewalk; 121 SF concrete bridge deck repair, type 2 modified.
