Description: The Project generally consists of cleaning and closed-circuit television (CCTV) inspection of approx. 70,016 LF of sanitary sewer within the District's collection system. Approx. 59,138 LF of the sewer included in the Project will require cleaning. Pipe sizes range from approx. 8" to 63" in diameter. Work includes associated access, traffic control, flow control, debris removal and disposal, restoration, inspection data collection and electronic submittal, and other incidental Work necessary to complete the Project.
SpecialDistrict · WI, US
Decision makers connected to this RFP from Madison Metropolitan Sewer District.
Adjacent opportunities open for bidding right now.
CityIL
Posted
Oct 15, 2026
Nov 3, 2026
From the first pre-RFP signals to the published RFP and its files.
Budget
719 days before RFP
The adopted CIP included a 2027–2031 access-to-interceptors project because 237 pipe segments totaling 96,300 lineal feet could not be cleaned and other pipes lacked inspection and maintenance access.
CIP ID# B12 Access to Interceptors START 2027 COMPLETION 2031 PROJECT TYPE Condition -- Conveyance System LOCATION Various DESCRIPTION The purpose of this project is to provide solutions for accessing interceptors to complete maintenance or emergency repairs. It is anticipated that this project will be financed through cash in the capital projects fund.…
Sewer televising and cleaning. Work under this item shall consist of cleaning and televising sanitary and storm sewers of various diameters and providing log sheets with DVD or Digital videos according to NASSCO standards. See attached file.
Posted
-
Nov 3, 2026
Work includes sewer cleaning, television inspection, removal of waste and other necessary work.
CityIA
Posted
Oct 5, 2026
Oct 28, 2026
Work includes approx 500 LF of mainline cleaning 8"; approx 500 LF of mainline cleaning 10"; approx 3,700 LF of mainline cleaning 12"; approx 600 LF of mainline cleaning 15"; approx 700 LF of mainline cleaning 18"; approx 300 LF of mainline cleaning 21"; related items including additional sewer cleaning, debris removal, bypass pumping, and traffic control.
CityIL
Posted
-
Nov 10, 2026
Work includes sewer cleaning, television inspection, removal of waste and other necessary work.
Madison Metropolitan Sewerage District FY2025 Budget
Budget · Oct 31, 2024
Strategic plan
343 days before RFP
MMSD's interceptor-evaluation guidelines recommended budgeting the following year's evaluation and preparing, bidding, and awarding its cleaning-and-televising contract.
Appendix No. 1 Interceptor Evaluations Detailed Work Sequence Guidelines a) Budget. Recommend and budget for the particular interceptor system(s) desired to be evaluated in the following year. Aim for an overall average of about 10% per year, but allow this to vary from year to year in order to evaluate entire interceptor systems as a unit wherever…
Madison Metropolitan Sewerage District CMOM Plan
Strategic plan · Nov 11, 2025
Interceptors cleaned 10% 53,100 ft/yr 11% Interceptor inspected 10% 53,100 ft/yr 14%
Madison Metropolitan Sewerage District CMOM Plan
Strategic plan · Nov 11, 2025