Higher EducationFL
Posted
Aug 30, 2026
Sep 29, 2026
FSU Soccer Field Site Improvements
Work includes bid packages 26 electrical; 31 earthwork.
Description: Soccer mini-pitch system foundation and site improvements.
City · NJ, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Township of Hamilton.
These related opportunities are still open for bidding.
Higher EducationFL
Posted
Aug 30, 2026
Sep 29, 2026
Work includes bid packages 26 electrical; 31 earthwork.
CityNM
Posted
Aug 24, 2026
Oct 15, 2026
Work includes wrf site improvements to include 1) conversion of existing north clarifier into toxic/eq tank including flow controls with electric motorized valves and magnetic flow meter, 2) demolition of old treatment structure - aeration/digester basin and south clarifier including piping termination within 5 feet of the structure and associated electrical terminations, 3) construct a gravity drain from the plant drain lift station to the headworks and remove the pumps and controls from the lift station, 4) miscellaneous yard piping, valve, and cleanout repairs, 5) miscellaneous drying bed concrete repairs, 6) miscellaneous grating repairs at sbr and ccc, and 7) miscellaneous repairs at the operations building.
CityCO
Posted
Sep 1, 2026
Oct 13, 2026
Work includes approx 8 LF of 8" PVC C900 water line; 5,975 LF of 12" PVC C900 water line; 395 LF of 3/4" pure-core water line service; 223 LF of 8" PVC C900 water line; 24 LF of 2" pan concrete curb & gutter; 23 SY of 6" concrete flatwork; 1,598 SY of 5" asphalt paving; 340 LF of 8" PVC C900 water line; 245 LF of 3/4" pure-core water line service; 308 LF of 4" blueboard insulation; 2,065 LF of 12" PVC C900 water line; 20 LF of 3/4" pure-core water line service; 320 LF of 2" HDD water line; 10 LF of 4" water line direct bury.
CityNE
Posted
Sep 2, 2026
Sep 24, 2026
Project consist of approx 176 LS of 24" Bore Hole Drill; 140 VF of 12" PVC casing; 40 LF of 6" DIP Water main; 95 TN of crushed rock surfacing; 81 CY of earthwork as embarkment; 3,556 LF of 6" PVC watermain.