CityTN
Posted
Sep 2, 2026
Sep 29, 2026
Construction of Downtown Water Main Replacements
Work includes approx 600 LF of 6" CL 350 DIP water main; 820 LF of 8" CL 350 DIP water main; 450 LF of 10" DIP water main, including valves, fire hydrants, fittings, concrete thrust blocking, lump sum items, replacement of existing bridge crossing, storm water conflict box, unclassified excavation, backfill, tie-ins, slick bores, restoration, pavement restoration, testing, traffic control inside and outside of TDOT right of ways, and all other appurtenances and other work.