2026 Pavement Rehabilitation & Resurfacing on Various County Roads RFP
The Major Items of Work Consist of: 1. 2. 3. Traffic Control (Includes Temporary Striping); Milling Asphalt Concrete Pavement; 93,600 SY; Full Depth Reclamation 10” depth; 6,100 SY; Full Depth Reclamation 8” depth, 6,300 SY 4. Recycled Asphalt Concrete: Patching, 9.5MM & 12.5MM, Perma Flex, and 19 MM; 17,200 TNs; 5. Grading to heal drop-off and rebuild shoulders along repaved roads without curb and gutter; 6. Thermoplastic Striping 7. Pavement rehabilitation & Resurfacing at a School Parking lot off of Mary Freeman Road, to be performed on days when school is out of session to include 19,100 SY of Milling, 4,800 SY of Deep Patching, and 3,000 tons of 19mm and 12.5mm Asphalt Concrete.