State AgencyBC
Jun 26, 2026
Closes
Aug 11, 2026
ACA Wood Pole Replacement Project
This procurement is being jointly issued by British Columbia Hydro and Power Authority (BC Hydro) and TELUS, collectively referred to as 'the Utilities', to obtain proposals from qualified proponents to deliver Ammoniacal Copper Arsenate (ACA) pole replacements primarily on Vancouver Island and in the Lower Mainland. The contract is for an initial term of three (3) years, with potential extensions up to eight (8) years. Approximately 15,000 ACA-treated utility poles installed between 1974 and 1984 are being replaced through a Design-Build delivery model.