Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of services for the 2026 Marion Blvd Bridge Approach & Deck Repair Project, encompassing pavement removal, bridge approach and deck repair, concrete barrier work, and pavement markings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work consist of approx 607.8 SY deck repair; 1,899.5 SY fiber reinforcement for concrete repair/overlay; 535.9 class 13 waste excavation; 1,286.4 SY 9" hot mixed asphalt mixture paved shoulder; 332.9 SY bridge approach; 1,997.6 SY leveling or strengthening course wedge hot mixed asphalt mixture.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
The work consist of approx 607.8 SY deck repair; 1,899.5 SY fiber reinforcement for concrete repair/overlay; 535.9 class 13 waste excavation; 1,286.4 SY 9" hot mixed asphalt mixture paved shoulder; 332.9 SY bridge approach; 1,997.6 SY leveling or strengthening course wedge hot mixed asphalt mixture.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removal and replacement of sidewalk and curb; Removal of overlay off of bridge deck and approach slabs and taper tie-in for new bridge deck overlay on approach slabs; Sound bridge deck and identify removals; Class 2 and 3 removals and patching from the top of the bridge deck; Place new Polyester Polymer Concrete (PPC) overlay on bridge deck and approach slabs; Saw and seal at abutment joints; Concrete sealer on sidewalk on bridge deck; Replace missing stone on fascia of west railing.
Posted Date
Dec 22, 2025
Due Date
Jan 20, 2026
Release: Dec 22, 2025
Close: Jan 20, 2026
Work includes removal and replacement of sidewalk and curb; Removal of overlay off of bridge deck and approach slabs and taper tie-in for new bridge deck overlay on approach slabs; Sound bridge deck and identify removals; Class 2 and 3 removals and patching from the top of the bridge deck; Place new Polyester Polymer Concrete (PPC) overlay on bridge deck and approach slabs; Saw and seal at abutment joints; Concrete sealer on sidewalk on bridge deck; Replace missing stone on fascia of west railing.
Work includes 444 SY hot-mix asphalt surface removal - butt joint; 130 ton hot-mix asphalt surface course, IL-9.5, mix "D", N70; 16 SY protective coat; 719 SY hot-mix asphalt surface removal, 1/4"; 147 SF relief joint 3"; 16. 4 CY concrete superstructure; 980 pound reinforcement bars, epoxy coated; 171 SF preformed joint strip seal; 388 SF combination concrete curb and gutter, type B-6. 24; 559 SY bridge deck latex concrete overlay, 2 3/4"; 559 SY bridge deck scarification 3/4"; 46 SF structural repair of concrete (depth equal to or less than 5").
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Work includes 444 SY hot-mix asphalt surface removal - butt joint; 130 ton hot-mix asphalt surface course, IL-9.5, mix "D", N70; 16 SY protective coat; 719 SY hot-mix asphalt surface removal, 1/4"; 147 SF relief joint 3"; 16. 4 CY concrete superstructure; 980 pound reinforcement bars, epoxy coated; 171 SF preformed joint strip seal; 388 SF combination concrete curb and gutter, type B-6. 24; 559 SY bridge deck latex concrete overlay, 2 3/4"; 559 SY bridge deck scarification 3/4"; 46 SF structural repair of concrete (depth equal to or less than 5").
The North Carolina Department of Transportation (Division 4) is soliciting sealed bids for an on-call contract to provide bridge deck and joint repair services at various locations within Division 4 (Edgecombe, Halifax, Johnston, Nash, Wayne and Wilson counties). Bidders must be prequalified by NCDOT; the contract is an Invitation for Bid/Division Purchase Order Contract to be awarded to the lowest responsible bidder and may result in multiple awards. The bid opening is scheduled for January 13, 2026 at 2:00 PM ET and the contract period is ID/IQ style for maintenance/repair work.
Posted Date
Dec 19, 2025
Due Date
Jan 13, 2026
Release: Dec 19, 2025
Close: Jan 13, 2026
The North Carolina Department of Transportation (Division 4) is soliciting sealed bids for an on-call contract to provide bridge deck and joint repair services at various locations within Division 4 (Edgecombe, Halifax, Johnston, Nash, Wayne and Wilson counties). Bidders must be prequalified by NCDOT; the contract is an Invitation for Bid/Division Purchase Order Contract to be awarded to the lowest responsible bidder and may result in multiple awards. The bid opening is scheduled for January 13, 2026 at 2:00 PM ET and the contract period is ID/IQ style for maintenance/repair work.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →