Posted
Nov 11, 2026
Dec 1, 2026
2026 Waterline Replacement Project RFP
2026 Waterline Replacement Project.
Description: Work includes locker replacement.
SchoolDistrict · MI, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Pellston Public Schools.
These related opportunities are still open for bidding.
Posted
Nov 11, 2026
Dec 1, 2026
2026 Waterline Replacement Project.
Higher EducationOK
Posted
Nov 7, 2026
Dec 2, 2026
2026 HVAC replacement project.
School DistrictMS
Posted
Nov 12, 2026
Jan 6, 2027
Replacement of the existing varsity and junior varsity football lockers at Olive Branch High School.
CityCA
Posted
Oct 29, 2026
Nov 16, 2026
Installation and/or replacement of approximately 3,500 linear feet of ductile iron water pipeline ranging from 8 inches to 24 inches, including water services, valves, fire hydrants, etc. The work shall consist of furnishing and installing all pipe, fittings, and appurtenances; all traffic control; all utility location and verification; all pavement removal and disposal; all pavement repair; all earthwork; compacting; protecting in place or removing and replacing all existing utilities, trees, and public and private improvements; testing and disinfecting all pipelines; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions