2026 HVAC Replacement Project RFP
2026 HVAC replacement project.
Description: The work is to replace approx 10,500 LF of sewer lines at eight locations.
SpecialDistrict · CA, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
185 days before RFP
The Board approved engineering design and bid-phase services for the 2026 Sewer Replacement Project.
15. 2026 Sewer Replacement Project: MOTION 26-03-08: Adopt Resolution 26-05 approving Project Assignment No. 61 to the Master Agreement with E2 Consulting Engineers, Inc. to provide engineering design and bid- phase services required for the 2026 Sewer Replacement Project for an amount not to exceed $180,000. Moved by: Director Gebhart Seconded by: Director…
Pebble Beach Community Services District Board of Directors Public Meeting Notice And Agenda
Board meeting · Mar 27, 2026
Budget
94 days before RFP
The final budget lists $2,660,000 for the aging sewer-line and manhole replacement programme, including two miles scheduled for construction in fiscal year 2026-27.
Wastewater: • $4,775,000: Engineering planning and design services, anticipated construction costs, and equipment purchases associated with rehabilitation of pump station P3 (Seal Rock), which includes replacement of wastewater pumps, access hatches, valving, electrical and control systems. The entire budgeted amount is carried over from the prior year. •…
Pebble Beach Community Services District FY2026-27 Budget
Budget · Jun 26, 2026
Board meeting
59 days before RFP
The minutes reported that design for the Sewer Line Replacement Project was nearing completion, with bidding planned for the fall.
MAINTENANCE, ENGINEERING & CONSTRUCTION 9. Operations and Maintenance Report: Principal Engineer Chris Simmons reported Forest Lake Reservoir (FLR) storage level decreased from 104 million to 82 million gallons due to typical summer demand, though storage remains higher than last year. Production was 91% in June and averaged 85% in July, when reservoir…
RFP published
Proposals due (Closed)
Pebble Beach Community Services District Regular Meeting Minutes
Board meeting · Jul 31, 2026
These related opportunities are still open for bidding.
Higher EducationOK
Posted
Nov 7, 2026
Dec 2, 2026
2026 HVAC replacement project.
Posted
Nov 11, 2026
Dec 1, 2026
2026 Waterline Replacement Project.
CityWI
Posted
-
Dec 16, 2026
The work for which bids are asked includes the following: removals of existing concrete curb & gutter, concrete sidewalk, concrete bases, and traffic signals; installation of concrete pavement, concrete curb & gutter, concrete pedestrian curb, concrete sidewalk, signs, pavement marking, and traffic signals; erosion and traffic control; along with cleanup and related miscellaneous construction. Contract work cannot begin until Tuesday, June 1, 2026 and must be completed by Friday, August 27, 2026.
School DistrictME
Posted
Nov 20, 2026
Dec 17, 2026
Partial replacement of approximately 137 squares of EPDM roofing at Lewiston Middle School.
Decision makers connected to this RFP from Pebble Beach Community Services District.