CityIA
Posted
Nov 6, 2026
Dec 8, 2026
2027 Marion Traffic Signal Pole Replacement Project
Replacement of select traffic signal poles at the intersections of HWY 151 & HWY 13 and HWY 100 & Oak Ln
Description: The work for which bids are asked includes the following: removals of existing concrete curb & gutter, concrete sidewalk, concrete bases, and traffic signals; installation of concrete pavement, concrete curb & gutter, concrete pedestrian curb, concrete sidewalk, signs, pavement marking, and traffic signals; erosion and traffic control; along with cleanup and related miscellaneous construction. Contract work cannot begin until Tuesday, June 1, 2026 and must be completed by Friday, August 27, 2026.
City · WI, US
Adjacent opportunities open for bidding right now.
CityIA
Posted
Nov 6, 2026
Dec 8, 2026
Replacement of select traffic signal poles at the intersections of HWY 151 & HWY 13 and HWY 100 & Oak Ln
CityCA
Posted
-
Dec 3, 2026
Work generally consists of, but is not limited to, traffic signal modifications, median modifications, asphalt rubber hot mix, pcc pavement and repair, curb and gutter, pcc access ramps, signing and striping, permits and licenses from adjacent jurisdictions and utilities.
CityGA
Posted
Nov 13, 2026
Dec 17, 2026
Sealed bid proposals for the ALTAMA AVENUE RESURFACING & TRAFFIC SIGNAL IMPROVEMENT PROJECT within the City of Brunswick will be received at the City of Brunswick Office of Public Works, 525 Lakewood Avenue, Brunswick, Georgia, Attention City Engineer, until 10:00 A.M., legal prevailing time on Thursday, December 17, 2026, at that time to be publicly opened and read aloud. This project consists of furnishing all labor, materials and equipment necessary for Altama Avenue asphalt milling and resurfacing along with traffic signal improvements including new strain poles, controllers and hardware, plus pavement markings and pedestrian crossing upgrades including cleanup and any incidental work thereto to complete the project. All work is to meet specifications and/or standards of the City of Brunswick, Georgia Department of Transportation and to include any addendums thereof. Project will include: ¿¿ Milling existing asphalt pavement; ¿¿ Placement of asphalt concrete pavement; ¿¿ Installation of traffic signal strain poles and wires; ¿¿ Installation of traffic signal controllers; signal heads and other hardware; ¿¿ Construction of ADA ramps and pedestrian crossings at intersections; ¿¿ Thermoplastic pavement marking
CityGA
Posted
-
Dec 17, 2026
Sealed bid proposals for the ALTAMA AVENUE RESURFACING \& TRAFFIC SIGNAL IMPROVEMENT PROJECT within the City of Brunswick will be received at the City of Brunswick Office of Public Works, 525 Lakewood Avenue, Brunswick, Georgia, Attention City Engineer, until 10:00 A.M., legal prevailing time on Thursday, December 17, 2026, at that time to be publicly opened and read aloud. No Bid may be withdrawn after closing for a period of 30 calendar days. This project consists of furnishing all labor, materials and equipment necessary for Altama Avenue asphalt milling and resurfacing along with traffic signal improvements including new strain poles, controllers and hardware, plus pavement markings and pedestrian crossing upgrades including cleanup and any incidental work thereto to complete the project. All work is to meet specifications and/or standards of the City of Brunswick, Georgia Department of Transportation and to include any addendums thereof. Project will include: � Milling existing asphalt pavement; � Placement of asphalt concrete pavement; � Installation of traffic signal strain poles and wires; � Installation of traffic signal controllers; signal heads and other hardware; � Construction of ADA ramps and pedestrian crossings at intersections; � Thermoplastic pavement marking
Decision makers connected to this RFP from City of Beaver Dam.
Solicitation files and supporting documents for this bid.