CountyNY
Posted
Oct 7, 2026
Oct 28, 2026
Greater Binghamton Airport Rehabilitation of Hangars 1 & 2 - Phase 2 RFP
Airport rehabilitation of hangars 1 & 2 - phase 2.
Description: The Columbus Regional Airport Authority is soliciting sealed bids for Rickenbacker Airport (LCK) Ramp 2 Phase 1 Rehabilitation. The posted description calls for milling and replacing asphalt over existing Portland cement concrete and making isolated full-depth asphalt repairs. It also calls for replacement of runway pavement markings and refers to Runway 5L-23R, wording that differs from the Ramp 2 project title.
SpecialDistrict · OH, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Columbus Regional Airport Authority.
Adjacent opportunities open for bidding right now.
CountyNY
Posted
Oct 7, 2026
Oct 28, 2026
Airport rehabilitation of hangars 1 & 2 - phase 2.
CountyNY
Posted
-
Oct 28, 2026
The project will rehabilitate hangars 2 and 3 at the greater binghamton airport to address aging infrastructure, safety concerns, and code deficiencies by upgrading outdated HVAC, electrical, plumbing, and fire alarm systems; and improving overall energy efficiency and safety. The work includes restoring damaged interiors, rehabilitating hangar bay doors, installing modern heating and ventilation solutions, and implementing ADA and current building code compliance measures such as accessible restrooms, fire - rated assemblies, co detection, and elevator installation.
Metropolitan Council - Twin Cities
State AgencyMN
Posted
Sep 8, 2026
Oct 8, 2026
Project consists of but not limited to approx. 1850 LF Silt Fence; 1850 LF Wood Mulch Berm; 5000 LF Filter Log/Biolog; 1640 CY Bossen Field Topsoil Excavation (EV); 1830 CY Topsoil Borrow (LV); 1640 CY Sodding, Lawn Type; 11440 SY Temp. Seed Mix; 9840 SY MNDOT Seed Mix Type Residential Turfgrass; 21300 SY Hydromulch; 10450 TN Haul Regulated Fill to Landfill; 1000 CY Stockpile Soil For Testing (EV); 6550 CY Haul Unsuitable, Clean Fill for Offsite Disposal (EV); see Bid Schedule (p320) for more details.
Posted
-
Oct 16, 2026
The Alaska Department of Transportation & Public Facilities invites sealed bids to rehabilitate the Tununak Airport runway, taxiway, apron, and airport access road. The federally funded work includes applying dust palliative, replacing airfield lighting, relocating the rotating beacon, and replacing wind cones and the segmented circle. It also includes installing aircraft tiedown anchors and signage, making minor repairs to the access road bridge, and replacing fencing and bollards near the snow removal equipment building.