Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project is upgrading the chilled water system by replacing chilled water control valves with a pressure-independent model, installing a magnetic filter, installing multiple pressure sensors, and replacing tertiary chilled water pumps. It is also installing an owner-furnished condenser water pump at the EMC. Controls work includes network controller upgrades, pressure sensor monitoring on the BAS, and control valve upgrades. Electrical work includes motor starter modifications and powering mechanical equipment. Work also includes the removal and replacement of concrete pads and structural steel work to reinforce a steel beam.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Water treatment plant solids upgrades.
Posted Date
Dec 30, 2025
Due Date
Feb 2, 2026
Release: Dec 30, 2025
Close: Feb 2, 2026
Water treatment plant solids upgrades.
AvailableProvide Southwest Water Treatment Plant Upgrades and Treatment Improvement.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Provide Southwest Water Treatment Plant Upgrades and Treatment Improvement.
AvailableThe Virginia Department of Transportation (VDOT) is soliciting bids for the 2026 Plant Mix - Primary project in Chesterfield County, Virginia. The work consists of plant mix/asphalt paving for primary routes at various locations. Bids are due on the letting date of January 28, 2026, and the time limit for completion extends to November 20, 2026.
Posted Date
-
Due Date
Jan 28, 2026
Release: -
Close: Jan 28, 2026
The Virginia Department of Transportation (VDOT) is soliciting bids for the 2026 Plant Mix - Primary project in Chesterfield County, Virginia. The work consists of plant mix/asphalt paving for primary routes at various locations. Bids are due on the letting date of January 28, 2026, and the time limit for completion extends to November 20, 2026.
AvailableWork includes interior upgrades.
Posted Date
Jan 22, 2026
Due Date
Feb 17, 2026
Release: Jan 22, 2026
Close: Feb 17, 2026
Work includes interior upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis