Lynn Water And Sewer Commission
Special DistrictMA
Posted
Sep 21, 2026
Oct 20, 2026
Cross Connection Control & Back Flow Device Testing Program RFP
Cross connection control & back flow device testing program.
Description: The City of Livonia is soliciting bids for its 2026 Water System Cross Connection Control Program. The work is to review and revise the City’s existing Cross-Connection Control Plan to meet Michigan Department of Environment, Great Lakes, and Energy requirements. Bids are due October 13, 2026, at 2:00 p.m. EDT.
City · MI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Lynn Water And Sewer Commission
Special DistrictMA
Posted
Sep 21, 2026
Oct 20, 2026
Cross connection control & back flow device testing program.
Beaufort-Jasper Water And Sewer Authority
Special DistrictSC
Posted
Sep 29, 2026
Oct 30, 2026
BJWSA seeks proposals from qualified firms to support its Cross-Connection Control and Backflow Prevention Program. The selected firm will help maintain the program in accordance with South Carolina requirements for public water systems, including records for backflow prevention assemblies, annual testing results, and related program administration. Proposals are due October 30, 2026, at 2:00 p.m. EDT.
Minneapolis-St Paul Metropolitan Airports Commission
Special DistrictMN
Posted
Sep 21, 2026
Oct 14, 2026
This project is to remove an existing steam station and install replacement heat exchangers and pumps for hydronic heating. The systems will be connected to the building automation system. Electrical work is to support these changes and to upgrade lighting in a mechanical room to LED. Work will also include concrete demo and formwork, and core drilling.
CityIL
Posted
Sep 8, 2026
Oct 23, 2026
The work generally consists of furnishing and installation of water system piping, fittings, valves, hydrants, services, connections, disconnections, and appurtenances for potable water. Installation will consist approx. of 1,500 LF of 4" PVC SDR 21 water main along the design route as shown on the plans. This work also includes surface restoration with various pavements, curbing, and sidewalks. This work shall include all labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the Contract Documents. WTP Controls and SCADA Replacement The work generally consists of furnishing and installation of controls and communication system within the existing Water Treatment Plant. The city would like to update the entire control panel. Upgrades would also include upgrading to cellular communication for easier monitoring, maintenance, troubleshooting, and to have remote support. The new system would also include a new programmable Logic Controller (PLC) and pressure monitoring controls. An HMI screen, a new Supervisory Control and Data Acquisition (SCADA), and replacing the VFDS at the existing pumps are also all parts of the new control upgrades.
Decision makers connected to this RFP from City of Livonia.