CityKS
Posted
-
Oct 13, 2026
2026 Collection System Rehabilitation: CIPP
Work includes rehabilitant of sanitary sewer collection system including cleaning, videotaping and logging defects, prepping line to receive cured in place pipe (cipp), sewage pump around as required, approx 5,864 LF of 8" cipp, 5 LF of 8" trenchless point repair, 3 internal drop installations, traffic control, and appurtenances. Additive areas: rehabilitant of sanitary sewer collection system including cleaning, videotaping and logging defects, prepping line to receive cured in place pipe (cipp), sewage pump around as required, approx 900 LF of 8" cipp, traffic control, and appurtenances.