CityIL
Posted
Sep 3, 2026
Sep 24, 2026
2026 Sewer Lining Project RFP
Work includes approx 5,383 LF 8" CIPP lining sanitary by hot water; 80 EA reinstate service lateral.
Description: Project includes approx. 6,037.5 LF of 8" Diameter CIPP Lining; 7,484.9 LF of 9" Diameter CIPP Lining; 7 EA os 10" Grouting Pipe Joints; 350 EA of Service Reinstatement.
SpecialDistrict · IL, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityIL
Posted
Sep 3, 2026
Sep 24, 2026
Work includes approx 5,383 LF 8" CIPP lining sanitary by hot water; 80 EA reinstate service lateral.
CityMO
Posted
Aug 28, 2026
Sep 30, 2026
Project includes quantities for approximately 5,437 linear feet of sanitary sewer lining in various sizes of cured-in-place pipe lining (CIPP) and the rehabilitation and restoration of structural integrity of 23 manholes. The project is spread throughout several locations within the City of Branson included are location maps displaying the CIPP Lining and manhole rehabilitation locations. The Contractor shall supply all labor, materials, equipment, testing, tools, and supervision to complete the sanitary sewer system lining improvements, as described in the General Requirements and Technical Specifications and as shown on the drawings.
CityMI
Posted
Aug 19, 2026
Sep 14, 2026
Work includes approx 3,600 LF of 8" sanitary sewer CIPP lining, steam; 620 LF of 18" sanitary sewer CIPP lining, steam; 132 EA lateral mainline connections; 3,600 LF of 8" sanitary sewer CIPP lining, UV.
CityMN
Posted
Jun 2, 2026
Sep 14, 2026
Work includes approx 74 EA lining sewer pipe lateral; 4,614 LF 8" sewer pipe lining CIPP by thermosetting resin pipe; 7,606 LF televise sanitary sewer; 60 LF cementitious manhole rehabilitation.
Decision makers connected to this RFP from Four Rivers Sanitation Authority.